WHAT IS A TIER-1 CONCEPT REVIEW?

A Tier-1 Concept Review is a practical, structured engineering review focused on evaluating an early-stage product idea before significant time and money are committed to detailed design, prototypes, or supplier involvement.

​

The review looks at the concept from a real-world engineering perspective, including intended function, basic feasibility, operating conditions, early design assumptions, preliminary manufacturing direction, and other unknowns.

​

The goal is to identify weak assumptions, missing requirements, and early design risks, then provide clear direction on what should be defined, tested, changed, or proven before the concept moves deeper into development.

BEGIN YOUR CONCEPT REVIEW
T1E Consulting Logo B Transparent_edited.png

No payment is required to submit. Project fit, scope, price, and lead time are confirmed first.

CR

WHY USE A TIER-1 CONCEPT REVIEW

CONFIRM EARLY ASSUMPTIONS BEFORE THEY SHAPE THE DESIGN

GET EXPERIENCED INPUT BEFORE INVESTING IN DETAILED CAD

IDENTIFY MAJOR UNKNOWNS THAT NEED TO BE RESOLVED

CHECK WHETHER THE CONCEPT APPEARS PRACTICALLY FEASIBLE

DEFINE WHAT SHOULD BE PROTOTYPED, TESTED, OR REFINED NEXT

MOVE INTO DESIGN DEVELOPMENT WITH CLEARER TECHNICAL DIRECTION

T1E BACKGROUND.png

THE TIER-1 DESIGN READINESS SYSTEM

T1E BACKGROUND.png

CORE OBJECTIVES

Confirm Concept Alignment
Assess Prototype Readiness
Identify Early Concept Risks
Define Testing Direction
Evaluate Production Direction
Prioritize Design Actions
CR M - testing.PNG
CR M - actions.PNG
CR M - risks.PNG
CR M - prototype.PNG
CR M - production.PNG
CR M - concept alignment.PNG
T1E BACKGROUND.png

COMMON APPLICATIONS

INDEPENDENT INVENTORS

Clarify an early idea before investing heavily in design or prototypes.

GARAGE PROTOTYPERS

Check whether the concept makes practical sense before the next build.

SERIOUS MAKERS

Identify weak assumptions, unknowns, and development risks early.

PRODUCT STARTUPS

Reduce uncertainty before committing resources to detailed product development.

MECHANICAL ENGINEERS

Get external EYES on feasibility, function, and early design direction.

PRODUCT DESIGNERS

test the concept before committing to detailed geometry and refinement.

OEM ENGINEERING TEAMS

Review early concepts before prototype, internal release, or supplier involvement.

SMALL BUSINESSES

Get practical engineering direction without dedicated internal resources.

T1E BACKGROUND.png

WHAT YOU GET

INITIAL CONCEPT ASSESSMENT REPORT

The Initial Concept Assessment Report (ICAR) establishes the starting point for a Tier-1 Concept Review before paid review begins.

​

It organizes the submitted concept, intended purpose, available supporting information, current development condition, known requirements, major unknowns, and any information still needed to perform a useful Concept Review.

​

The ICAR gives the client a clear picture of how Tier-1 Engineer understands the idea before deeper evaluation begins. It confirms whether the concept is ready for review, defines what will be evaluated, establishes the review scope, price, and estimated lead time, and identifies anything that should be clarified before moving forward.

VIEW FULL SAMPLE ICAR

THE ICAR ESTABLISHES:

THE CURRENT CONDITION AND DEFINITION OF THE SUBMITTED CONCEPT

THE STATED PURPOSE, FUNCTION, AND INTENDED USE

AN ORGANIZED SUMMARY OF THE AVAILABLE CONCEPT INFORMATION

KNOWN REQUIREMENTS, ASSUMPTIONS, AND MAJOR UNKNOWNS

WHETHER THE CONCEPT IS READY FOR MEANINGFUL REVIEW

A CLEARLY DEFINED SCOPE FOR THE CONCEPT REVIEW

THE PRICE AND ESTIMATED LEAD TIME BEFORE WORK BEGINS

ANY MISSING INFORMATION NEEDED TO SUPPORT THE REVIEW

A CLEAR PATH TO INITIATE THE PAID CONCEPT REVIEW

The ICAR gives both parties a shared understanding of the concept, identifies what is known and still uncertain, and establishes the scope, timing, cost, and next steps before the Concept Review begins.

CONCEPT REVIEW REPORT

The Concept Review Report (CRR) is the final deliverable of a Tier-1 Concept Review and contains the detailed engineering evaluation developed from the approved concept scope.

​

It evaluates concept alignment, practical feasibility, prototype readiness, early design concerns, and concept-level manufacturability risks while identifying the assumptions, requirements, and unknowns that should be addressed before deeper development.

​

The CRR is intended to turn an early idea into a clearer development path. It identifies what appears workable, what needs attention, what should be proven through prototyping or testing, and which actions should come next before committing additional time and resources to detailed design. The CRR goes beyond generic concept feedback by combining feasibility, prototype-readiness, design and manufacturability findings, and a staged prototype/testing plan.

VIEW FULL SAMPLE CRR

THE CRR PROVIDES:

A CLEAR ASSESSMENT OF OVERALL CONCEPT FEASIBILITY

EVALUATION OF CONCEPT ALIGNMENT AND INTENDED FUNCTION

IDENTIFICATION OF EARLY DESIGN CONCERNS AND WEAK ASSUMPTIONS

CONCEPT-LEVEL MANUFACTURABILITY OBSERVATIONS

A DETERMINATION OF PROTOTYPE READINESS

PRIORITIZED CONCEPT FINDINGS AND RISK AREAS

PRACTICAL RECOMMENDATIONS FOR CONCEPT REFINEMENT

PROTOTYPE METHODS, TESTING DIRECTION, AND LEARNING GOALS

A CLEAR DEVELOPMENT PATH AND RECOMMENDED NEXT STEPS

The CRR gives the client a structured evaluation of the concept itself, showing what appears viable, what still needs to be resolved, and what should be learned or changed before moving into detailed design.

T1E BACKGROUND.png

REVIEW SCOPE AND PRICING

WHAT DOES A CONCEPT REVIEW COVER?

A Tier-1 Concept Review uses one defined review scope rather than multiple Review Levels. The service is intended for early-stage concepts where the primary need is to evaluate feasibility, function, development direction, major unknowns, and what should be proven before detailed design begins.

​

The same core Concept Review process and deliverables apply to every accepted project. The ICAR establishes the approved review scope before paid work begins, and the CRR documents the completed concept evaluation and recommended next steps.

​

If a submission is too broad, too mature, or requires analysis beyond the intended Concept Review scope, Tier-1 Engineer may narrow the review, request clarification, or recommend a Design Review or DFM Audit instead.

​

If the submitted project requires substantially more detailed design or manufacturing analysis, Tier-1 Engineer will identify that during the initial assessment before paid review begins.

CONCEPT REVIEW SCOPE DRIVERS

CONCEPT DEFINITION

NUMBER OF COMPONENTS OR FUNCTIONS

CLARITY OF DESIGN INTENT

NUMBER OF MAJOR UNKNOWNS

AVAILABLE SUPPORTING INFORMATION

FUNCTIONAL COMPLEXITY

PROTOTYPE / TESTING QUESTIONS

OVERALL CONCEPT REVIEW EFFORT

THE CONCEPT REVIEW IS INTENDED TO PROVIDE A CLEAR, ACCESSIBLE ENGINEERING CHECKPOINT WITHOUT REQUIRING THE CLIENT TO SELECT FROM MULTIPLE SERVICE TIERS.

Concept Reviews use a starting price rather than fixed Review Levels. The listed price applies to typical early-stage concepts with a manageable scope, limited complexity, and enough information to support a focused engineering review.

​

Larger assemblies, broader concepts, extensive documentation, or projects requiring substantially more engineering effort may be priced above the starting rate. Final scope, price, and lead time are established during the initial concept assessment and presented in the ICAR before any paid review begins.

Initial concept assessment (ICAR)

FULL Concept Review REPORT (CRR)

Findings and explanations

FUNCTIONALITY ASSESSMENT

RECOMMENDED TESTING OUTLINE

RECOMMENDED PROTOTYPE METHOD

Recommended next steps

HOW CONCEPT REVIEW PRICING WORKS

WHAT'S INCLUDED

CONCEPT REVIEW

TYPICAL PROJECT CHARACTERISTICS

ROUGH CONCEPTS

EARLY CAD

SKETCHES

PROTOTYPES

REVIEW SCOPE FACTORS

COMPLEXITY

ASSEMBLY SIZE

INFORMATION CLARITY

DESIGN INTENT CLARITY

TYPICAL LEAD TIME

3-5

BUSINESS DAYS

STARTING AT:

$199

Product ideas

Hand sketches

Early CAD

Rough prototypes

Early development questions

Existing-product concepts

Concepts needing direction

TYPICAL PROJECTS

Level 1 is normally assigned when the submitted design is relatively simple and can be understood without extensive investigation. The design intent is fairly clear, the documentation package is manageable, and the number of parts, interfaces, requirements, or areas requiring engineering evaluation is limited.

​

A Level 1 project may still contain meaningful design concerns. The classification simply indicates that those concerns can reasonably be evaluated and documented within a focused review effort.

Relatively simple part or assembly

Limited number of interfaces

Clearly defined design intent

Manageable documentation package

Few competing requirements

Focused or well-defined concerns

Lower overall review complexity

WHY A PROJECT MAY BE ASSIGNED LEVEL 1

COMMON LEVEL 1 CHARACTERISTICS

FOCUSED REVIEW

TYPICAL PROJECT CHARACTERISTICS

SIMPLE PARTS

EARLY PROTOTYPES

FOCUSED CONCERNS

SIMPLE ASSEMBLIES

REVIEW LEVEL FACTORS

LOW COMPLEXITY

LIMITED VARIABLES

CLEAR DESIGN INTENT

SMALL FILE PACKAGE

LEAD TIME

3-5

BUSINESS DAYS

$399

  • Concept Reviews use a starting price rather than fixed Review Levels. The listed price applies to typical early-stage concepts with a manageable scope, limited complexity, and enough information to support a focused engineering review.

    ​

    Larger assemblies, broader concepts, extensive documentation, or projects requiring substantially more engineering effort may be priced above the starting rate. Final price and lead time are established during the initial assessment and presented in the ICAR before any paid review begins.

    Initial concept assessment (ICAR)

    Full Concept Review REPORT (CRR)

    Findings and explanations

    FUNCIONALITY ASSESSMENT

    RECOMMENDED TESTING OUTLINE

    RECOMMENDED PROTOTYPE METHODS

    RECOMMENDED NEXT STEPS

    HOW CONCEPT REVIEW PRICING WORKS

    WHAT'S

    INCLUDED

    CONCEPT REVIEW

    TYPICAL PROJECT CHARACTERISTICS

    ROUGH CONCEPTS

    EARLY CAD

    SKETCHES

    PROTOTYPES

    REVIEW SCOPE FACTORS

    COMPLEXITY

    ASSEMBLY SIZE

    INFORMATION CLARITY

    DESIGN INTENT CLARITY

     TYPICAL LEAD TIME

    3-5

    BUSINESS DAYS

    $199

    STARTING AT:

    Product ideas

    Hand sketches

    Early CAD

    Rough prototypes

    Early development questions

    Existing-product concepts

    Concepts needing direction

    TYPICAL PROJECTS

T1E BACKGROUND.png

HOW IT WORKS

THE FOUR-PHASE SYSTEM

The Tier-1 Concept Review process uses a structured four-phase system to keep the review clear, predictable, and controlled from initial concept submission through final report delivery.

​

Before paid review begins, the submitted concept is screened for project fit, available information, concept definition, and overall review scope. This helps identify missing context, clarify expectations, and establish the price and lead time before the review starts.

​

Each phase has a defined purpose and gives the client a clear checkpoint before committing to the full Concept Review. It also keeps the review focused on the submitted concept, stated goals, known requirements, and approved review scope.

​

The result is a straightforward concept evaluation process with clear boundaries, useful engineering feedback, and practical development direction delivered through the CRR.

PHASE SYSTEM ADVANTAGES

STRUCTURE PROVIDES CLARITY AND CLEAR RESPONISBILITIES

PROJECT FIT IS CONFIRMED BEFORE PAYMENT

PRICE AND LEAD TIME ARE DEFINED UP FRONT

MISSING OR UNCLEAR INFORMATION IS IDENTIFIED EARLY

CLEAR DELIVERABLES AND NEXT STEPS ARE ESTABLISHED

PAID REVIEW BEGINS ONLY AFTER CLIENT APPROVAL OF ICAR

PROVIDES A STREAMLINED, LOW STRESS CLIENT EXPERIENCE

CONCEPT REVIEW PHASES

Concept Review Phase One Overview

WHAT YOU DO:

Gather the available concept information, complete the Concept Review Project Submission Form, upload supporting material, and submit the project.

Concept Review Phase Two Overview

WHAT YOU DO:

Wait for confirmation of project fit and ICAR delivery. Review the proposed price and lead time, then approve and pay to begin the Concept Review.

Concept Review Phase Three Overview

WHAT YOU DO:

Wait for Tier-1 Engineer to complete the Review of the approved submission and develop the findings, ACTIONS, and next-step guidance in the CRR.

Concept Review Phase Four Overview

WHAT YOU DO:

You receive the CRR with concept findings, prototype & testing direction, and recommended ACTIONS. The review closes.

CR PHASE ONE.PNG

WHAT YOU DO:

Gather the available concept information, complete the Concept Review Project Submission Form, upload supporting material, and submit the project.

CR PHASE TWO.PNG
CR PHASE THREE.PNG
CR PHASE FOUR.PNG

WHAT YOU DO:

Wait for confirmation of project fit and ICAR delivery. Review the proposed scope, price, and lead time, then approve and pay to begin the Concept Review.

WHAT YOU DO:

Wait for Tier-1 Engineer to complete the structured Concept Review of the approved submission and develop the findings, recommendations, and next-step guidance in the CRR.

WHAT YOU DO:

You receive the CRR with concept findings, engineering explanations, prototype or testing direction, and recommended next steps. The review closes.

T1E BACKGROUND.png

HOW TO BEGIN

GUIDED SUBMISSION METHOD

Starting a Concept Review does not require a finished design, formal engineering package, or every technical decision already defined. The goal is to provide enough information to understand what the concept is intended to accomplish, who or what it is for, how you currently expect it to work, and what questions or uncertainties still need to be resolved.

​

The steps below are designed to help organize that information before submission. Each section explains what is useful to provide, what the terminology means, and the level of detail that can help the review. If something is unknown, undecided, or only a rough assumption, that is completely acceptable. Simply provide what is currently known.

​

A well-prepared submission helps Tier-1 Engineer understand the concept faster, identify important unknowns early, and establish an appropriate review scope before paid work begins.

THE PROJECT SUBMISSION FORM

The Concept Review Project Submission Form provides the context needed to understand the idea before the review begins. Sketches, CAD, photos, or prototypes can show what currently exists, but they do not always explain the problem being solved, intended function, user needs, known constraints, or other questions.

​

Providing as much relevant detail as possible helps reduce assumptions, identify missing information early, clarify what you want evaluated, and establish an accurate review.

​

You do not need to have every answer. If something is unknown, undecided, or still being explored, simply say so. A clear and honest submission gives the Concept Review the best possible starting point.

BEGIN YOUR CONCEPT REVIEW

EXPLORE THE STEPS BELOW TO PREPARE FOR A TIER-1 CONCEPT REVIEW SUBMISSION

  • This establishes why the concept exists and what it must accomplish. It includes the problem being solved, the primary function of the proposed product, and the practical performance requirements that define what a successful concept needs to do.

    Design Intent Logo.PNG

    PROBLEM BEING SOLVED

    WHAT PROBLEM OR NEED IS THE CONCEPT INTENDED TO ADDRESS?

    The problem being solved describes the real-world need that led to the concept in the first place. It explains what condition, inconvenience, limitation, or opportunity the product is intended to improve. Defining the problem helps keep the Concept Review focused on whether the proposed idea actually addresses the reason it exists.

    EXAMPLES

    • Keep an object securely positioned

    • Reduce unwanted movement

    • Protect a component from damage

    • Improve access or usability

    • Simplify an existing task

    • Replace a complicated existing solution

    A clear problem statement helps prevent the concept from becoming a solution in search of a problem.

    Performance Logo.PNG

    PRIMARY FUNCTION

    WHAT IS THE MAIN JOB THE CONCEPT MUST PERFORM?

    The primary function is the most important action or result the product must provide to solve the stated problem. It describes what the concept actually needs to do when used as intended. A product may eventually perform several functions, but identifying the primary one helps establish what must work before secondary features or refinements are considered.

    EXAMPLES

    • Retain or support an object

    • Connect two components

    • Guide or control movement

    • Protect an internal assembly

    • Position something accurately

    • Allow controlled opening or release

    • Provide adjustment or retention

    If the concept cannot reliably perform its primary function, secondary features have limited value.

    Special Requirements Logo.PNG

    PERFORMANCE REQUIREMENTS

    WHAT MUST THE CONCEPT WITHSTAND OR ACHIEVE?

    Performance requirements describe the conditions the concept must satisfy while performing its intended function. These may involve loads, forces, movement, fit, durability, operating life, or other measurable expectations. They help turn a general idea into requirements that can eventually be evaluated through design and prototype testing.

    EXAMPLES

    • Expected loads or forces

    • Required holding or release force

    • Fit range

    • Movement or travel

    • Required stiffness or flexibility

    • Expected operating cycles

    • Impact or rough-use resistance

    • Required accuracy or positioning

    • Noise limitations

    • Durability expectations

    Exact values are helpful when known, but early estimates or desired behavior are completely acceptable.

  • This establishes the real-world application of the concept. It includes the use environment, how the user will interact with the product, and what people, objects, equipment, or surfaces the concept must fit or interface with during normal use.

    Environment Logo.PNG

    USE ENVIRONMENT

    UNDER WHAT CONDITIONS WILL THE PRODUCT BE USED?

    The use environment is the physical setting and operating conditions the concept is expected to encounter during normal use, storage, transportation, or field activity. This may include temperature, moisture, dirt, abrasion, sunlight, vibration, impact, chemicals, or other environmental conditions that could affect function, durability, comfort, or material direction.

    EXAMPLES

    • Indoor, climate-controlled use

    • Outdoor year-round exposure

    • Rain, water, or high humidity

    • Extreme heat or cold

    • Dirt, dust, mud, or debris

    • UV and sunlight exposure

    • Oil, fuel, or chemicals

    • Salt or corrosive environments

    • Continuous vibration

    • Shock or impact

    • Rough field use

    A simple description is acceptable. For example: “Used outdoors during hiking, rain, dirt, and rough handling.”

    Assembly Logo.PNG

    USER INTERACTION

    HOW WILL THE USER OPERATE, ADJUST, OR HANDLE THE PRODUCT?

    User interaction describes how a person is expected to physically engage with the concept during normal use. This may include holding, wearing, inserting, removing, adjusting, carrying, opening, releasing, or repositioning the product. Understanding these interactions helps identify usability concerns, awkward motions, access issues, and conditions that should be evaluated during prototyping.

    EXAMPLES

    • Held or carried by hand

    • Worn on the body

    • Inserted or removed repeatedly

    • Opened or closed during use

    • Adjusted by the user

    • Operated while wearing gloves

    • Used with one hand

    • Accessed while moving

    • Serviced or repositioned

    • Exposed to repeated handling

    Describe how the product will actually be used, even if the interaction is still only an early assumption.

    Cosmetic Logo.PNG

    FIT & INTERFACE REQUIREMENTS

    WHAT DOES THE CONCEPT NEED TO FIT, CONTACT, OR INTERACT WITH?

    Fit and interface requirements describe the people, components, equipment, surfaces, or objects the concept must physically work with. This includes size ranges, contact areas, mating conditions, clearances, attachment points, and other relationships that may determine whether the concept can function successfully across its intended use range.

    EXAMPLES

    • Existing mating components

    • User size or body-fit range

    • Equipment size variations

    • Mounting locations

    • Contact surfaces

    • Required clearances

    • Retained objects

    • Attachment points

    • Moving interfaces

    • Alignment requirements

    • Multiple product sizes or variants

    If the concept must work across a range of users, parts, or equipment sizes, identify that range as clearly as possible.

  • A complete design review should include general manufacturing direction for the design. This includes the planned manufacturing process, planned material, and expected production volume, at a minimum. These decisions do not need to be final. Current assumptions, alternatives being considered, or items that are still undecided are all useful information to include for the review. Often, manufacturing direction is not yet known or finalized. In that case, Tier-1 Engineer will provide manufacturing process direction through the DRR.

    Process Logo.PNG

    EXPECTED PROCESS

    HOW DO YOU CURRENTLY EXPECT THE PRODUCT MAY BE MADE?

    The expected process is the manufacturing method currently being considered for the product or its major components. At the concept stage, this may be little more than an early assumption. Understanding the likely process helps identify obvious conflicts between the concept and the way the product may eventually need to be produced.

    EXAMPLES

    • Injection molding

    • CNC machining

    • Die casting

    • Sheet metal forming

    • Extrusion

    • Additive manufacturing

    • Fabrication and welding

    • Casting

    • Off-the-shelf components

    • Combination of processes

    If no process has been considered yet, simply identify it as not yet determined.

    Material Logo.PNG

    MATERIAL DIRECTION

    WHAT MATERIALS ARE CURRENTLY BEING CONSIDERED?

    Material direction describes any material, material family, or general material characteristics currently being considered for the concept. A specific grade is not required. Even broad assumptions such as plastic, aluminum, steel, rubber, or flexible polymer can provide useful context when evaluating feasibility and early design direction.

    EXAMPLES

    • Aluminum

    • Carbon steel

    • Stainless steel

    • ABS

    • Nylon

    • Polycarbonate

    • Polypropylene

    • Rubber or elastomer

    • Reinforced plastic

    • Composite material

    • Material not yet selected

    If several materials are being considered, include the options and any reason one may be preferred.

    Volume Logo.PNG

    EST. PRODUCTION VOLUME

    Approximately how many parts do you expect to PRODUCE?

    Estimated production volume is the rough quantity the concept may eventually need to support if development is successful. At this stage, an exact forecast is not expected. A general range helps provide context for prototype strategy, manufacturing direction, design complexity, and whether the concept could reasonably scale beyond early development.

    EXAMPLES

    • One proof-of-concept prototype

    • A handful of development units

    • Fewer than 100 units

    • Hundreds per year

    • Thousands per year

    • Tens of thousands per year

    • High-volume production

    • Volume not yet known

    A rough estimate is enough. If future demand is completely unknown, simply state that production volume has not yet been established.

  • WHAT WOULD YOU LIKE THE CONCEPT REVIEW TO HELP YOU UNDERSTAND, CHALLENGE, OR CLARIFY?

    Your questions and concerns identify the areas of the concept where you want additional engineering attention. These may be uncertainties, assumptions you want challenged, functions you are unsure about, decisions that have not yet been made, or simply areas where you do not know what the next step should be.

    ​

    You do not need to diagnose the issue yourself or describe it using engineering terminology. Explain what you are trying to accomplish, what you are unsure about, or what has been difficult to work through so far. These concerns provide useful context and help Tier-1 Engineer understand where the Concept Review can provide the most value, such as:

    • “I am not sure whether this idea will work the way I expect.”

    • “I do not know the best way to make this mechanism function.”

    • “I am unsure whether this concept is too complicated.”

    • “I want to know what I should prototype first.”

    • “I am not sure what material or process makes sense yet.”

    • “I want to identify the biggest weaknesses before I spend more money.”

    • “I do not know whether this feature is actually necessary.”

    • “I am unsure how the product should attach, move, or adjust.”

    • “I have several possible directions and do not know which one to pursue.”

    • “I want to know what assumptions need to be proven before detailed design.”

    • “I do not have a specific concern. I want an experienced engineering review of the overall concept.”

    NOT SURE WHAT TO ASK?

    That is completely acceptable. A Concept Review does not require you to already know what the important engineering questions are. If your goal is simply to have the idea evaluated before committing more time, money, or design effort, state that in the submission. The review is intended to help identify the questions, risks, and unknowns that should be addressed next.

  • Design documentation is the collection of information used to communicate the product, its geometry, requirements, interfaces, and current state of development. It may range from a complete CAD and drawing package to a few sketches, prototype photos, or written notes.

    ​

    You do not need every type of documentation listed below. Submit the most current and relevant information you have. Providing multiple forms of documentation can help clarify details that may not be obvious from a single CAD model or drawing.

    USEFUL SUBMISSION MATERIALS MAY INCLUDE:

    3D CAD MODELS

    Computer Aided Design.PNG

    Digital models showing the geometry of individual parts or complete assemblies. STEP and Parasolid files are preferred when available.

    PREFERRED FILE TYPES

    .STEP

    .IGES

    .X_T

    2D ENGINEERING DRAWINGS

    Equal Bilateral.PNG

    Drawings showing dimensions, tolerances, material callouts, notes, finishes, and other requirements that may not be defined by the CAD model alone.

    PREFERRED FILE TYPES

    .PDF

    .PNG

    .JPEG

    ASSEMBLY MODELS OR DRAWINGS

    combine.PNG

    Documentation showing how multiple components fit together, interact, move, fasten, or locate relative to one another.

    PREFERRED FILE TYPES

    .STEP

    .IGES

    .X_T

    .PDF

    .PNG

    SKETCHES OR CONCEPT DRAWINGS

    Formal or informal drawings used to explain features, mechanisms, intended changes, or design ideas. Hand-drawn sketches are completely acceptable.

    PREFERRED FILE TYPES

    .PDF

    .PNG

    .JPEG

    PROTOTYPE OR PRODUCT PHOTOS

    Images showing the current physical design, assembly condition, installation, failure area, or other real-world information that may help explain the project.

    PREFERRED FILE TYPES

    .PPTX

    .PNG

    .JPEG

    DESIGN REQUIREMENTS

    Written requirements describing dimensional, functional, performance, material, cosmetic, customer, or other project expectations.

    PREFERRED FILE TYPES

    .MSG

    .DOCX

    .PNG

    .PDF

    .JPEG

    SUPPLIER FEEDBACK

    DFM comments, markups, emails, quotations, or technical questions received from manufacturers or suppliers.

    PREFERRED FILE TYPES

    .PDF

    .PNG

    .MSG

    RFQ OR QUOTING DOCUMENTS

    Information previously prepared for supplier quoting that may define expected volume, material, process, tooling, or other production assumptions.

    PREFERRED FILE TYPES

    .MSG

    .DOCX

    .PNG

    .PDF

    .JPEG

    TEST OR INSPECTION REPORTS

    Digital Calipers.PNG

    Dimensional reports, prototype testing, failure information, fit checks, inspection data, or other results that provide additional context about how the current design performs.

    PREFERRED FILE TYPES

    .MSG

    .DOCX

    .PNG

    .PDF

    .JPEG

    REFERENCE DOCUMENTS OR NOTES

    Documents Logo.PNG

    Any additional information that helps explain the design, its history, known problems, previous decisions, or requirements that should be considered during the review.

    PREFERRED FILE TYPES

    .MSG

    .DOCX

    .PNG

    .PDF

    .JPEG

    WHAT SHOULD I SUBMIT?

    Start with the information that best represents the current version of the design. Avoid including obsolete files unless they provide useful background, and clearly identify any older documentation that is being submitted for reference only.

    ​

    If you are unsure whether a particular file is useful, include it or describe it in the submission. The initial assessment is used to determine whether the available documentation is sufficient and identify anything additional that may be needed before the Concept Review begins.

    ​

    You do not need a complete professional engineering package to submit. A rough CAD model, a prototype, photographs, sketches, or other supporting information may be enough to begin depending on the project.

  • Concept submission is the starting point for the Tier-1 Concept Review process. You will complete the Concept Review submission form, provide the information outlined in the previous steps, and upload the most relevant concept materials currently available.

    ​

    Submission does not begin the paid Concept Review. It gives Tier-1 Engineer the information needed to understand the idea, confirm that it is a good fit for the service, and establish the scope and engineering effort expected to complete the review properly.

    BEGIN YOUR CONCEPT REVIEW

    DURING INITIAL ASSESSMENT, TIER-1 ENGINEER WILL:

    CONFIRM THAT THE PROJECT FALLS WITHIN THE CONCEPT REVIEW SCOPE

    REVIEW THE SUBMITTED CONCEPT INFORMATION AND SUPPORTING MATERIAL

    EVALUATE THE CURRENT DEFINITION AND COMPLEXITY OF THE CONCEPT

    IDENTIFY MISSING OR UNCLEAR INFORMATION THAT MAY BE NEEDED

    ESTABLISH THE REVIEW SCOPE, PRICE, AND ESTIMATED LEAD TIME

    PREPARE THE INITIAL CONCEPT ASSESSMENT REPORT (ICAR)

    WHAT HAPPENS NEXT?

    If the project is accepted, you will receive the ICAR documenting the initial assessment, review scope, price, estimated lead time, and any additional information required before the technical Concept Review begins.

    ​

    You can review the ICAR before deciding whether to proceed. No paid Concept Review work begins until the ICAR is approved and payment is received.

    ​

    If the concept is not yet ready for review, additional information may be requested or a more appropriate Tier-1 Design Readiness service may be recommended.

T1E BACKGROUND.png

HOW TO BEGIN

GUIDED SUBMISSION METHOD

Starting a Concept Review does not require a finished design, formal engineering package, or every technical decision already defined. The goal is to provide enough information to understand what the concept is intended to accomplish, who or what it is for, how you currently expect it to work, and what questions still need to be resolved.

​

The steps below are designed to help organize that information before submission. Each section explains what is useful to provide, what the terminology means, and the level of detail that can help the review. If something is unknown, undecided, or only a rough assumption, that is completely acceptable. Simply provide what is currently known.

​

A well-prepared submission helps Tier-1 Engineer understand the concept faster, identify important unknowns, and establish an understanding before work begins.

THE PROJECT SUBMISSION FORM

The Concept Review Project Submission Form provides the context needed to understand the idea before the technical review begins. Sketches, CAD, photos, or prototypes can show what currently exists, but they do not always explain the problem being solved, intended function, user needs, known constraints, or questions behind the concept.

​

Providing as much relevant detail as possible helps reduce assumptions, identify missing information early, clarify what you want evaluated, and establish an accurate review scope.

​

You do not need to have every answer. If something is unknown, undecided, or still being explored, simply say so. A clear and honest submission gives the Concept Review the best possible starting point.

BEGIN YOUR CONCEPT REVIEW

EXPLORE THE STEPS BELOW TO PREPARE FOR A TIER-1 CONCEPT REVIEW SUBMISSION

  • This establishes why the concept exists and what it must accomplish. It includes the problem being solved, the primary function of the proposed product, and the practical performance requirements that define what a successful concept needs to do.

    Design Intent Logo.PNG

    PROBLEM BEING SOLVED

    WHAT PROBLEM OR NEED IS THE CONCEPT INTENDED TO ADDRESS?

    The problem being solved describes the real-world need that led to the concept in the first place. It explains what condition, inconvenience, limitation, or opportunity the product is intended to improve. Defining the problem helps keep the Concept Review focused on whether the proposed idea actually addresses the reason it exists.

    EXAMPLES

    • Keep an object securely positioned

    • Reduce unwanted movement

    • Protect a component from damage

    • Improve access or usability

    • Simplify an existing task

    • Replace a complicated existing solution

    A clear problem statement helps prevent the concept from becoming a solution in search of a problem.

    Performance Logo.PNG

    PRIMARY FUNCTION

    WHAT IS THE MAIN JOB THE CONCEPT MUST PERFORM?

    The primary function is the most important action or result the product must provide to solve the stated problem. It describes what the concept actually needs to do when used as intended. A product may eventually perform several functions, but identifying the primary one helps establish what must work before secondary features or refinements are considered.

    EXAMPLES

    • Retain or support an object

    • Connect two components

    • Guide or control movement

    • Protect an internal assembly

    • Position something accurately

    • Allow controlled opening or release

    • Provide adjustment or retention

    ​If the concept cannot reliably perform its primary function, secondary features have limited value.

    Special Requirements Logo.PNG

    PERFORMANCE REQUIREMENTS

    WHAT MUST THE CONCEPT WITHSTAND OR ACHIEVE?

    Performance requirements describe the practical conditions the concept must satisfy while performing its intended function. These may involve loads, forces, movement, fit, durability, operating life, or other measurable expectations. They help turn a general idea into requirements that can eventually be evaluated through design and prototype testing.

    EXAMPLES

    • Expected loads or forces

    • Required holding or release force

    • Fit range

    • Movement or travel

    • Required stiffness or flexibility

    • Expected operating cycles

    • Impact or rough-use resistance

    • Required accuracy or positioning

    • Noise limitations

    • Durability expectations

    Exact values are helpful when known, but early estimates or desired behavior are completely acceptable.

  • This establishes the real-world application of the concept. It includes the use environment, how the user will interact with the product, and what people, objects, equipment, or surfaces the concept must fit or interface with during normal use.

    Environment Logo.PNG

    USE ENVIRONMENT

    UNDER WHAT CONDITIONS WILL THE PRODUCT BE USED?

    The use environment is the physical setting and operating conditions the product is expected to encounter during normal use, storage, transportation, or service. This includes exposure to temperature, moisture, chemicals, sunlight, contamination, vibration, impact, and other environmental conditions that may affect the design.

    EXAMPLES

    • Indoor, climate-controlled use

    • Outdoor year-round exposure

    • Rain, water, or high humidity

    • Extreme heat or cold

    • Dirt, dust, mud, or debris

    • UV and sunlight exposure

    • Oil, fuel, or other chemicals

    • Salt or corrosive environments

    • Continuous vibration

    • Shock or impact

    • Automotive or underhood

    A simple description is acceptable. For example:
    “Mounted outdoors year-round."

    Assembly Logo.PNG

    INSTALLATION REQUIREMENTS

    How does the design assemble, attach, OR INSTALL?

    Assembly requirements describe how the part or product connects to other components and what must happen during installation, assembly, adjustment, maintenance, or disassembly. This includes fasteners, mating features, alignment, access, clearances, assembly order, tooling, and any components the design must interface with.

    EXAMPLES

    • Bolts to an existing surface

    • Snaps into another component

    • Assembled without special tools

    • Requires tool access

    • Must align with existing features

    • Removable for maintenance

    • Assembled in a specific sequence

    • Must prevent incorrect assembly

    • One person assembly

    Exact values are helpful when available, but they are not required for every submission.

    Cosmetic Logo.PNG

    COSMETIC REQUIREMENTS

    WHAT APPEARANCE EXPECTATIONS does the design need to meet?

    Cosmetic requirements define how the finished product is expected to look and which surfaces or features are visually important. These requirements may involve surface finish, texture, color, gloss, visible defects, parting lines, witness marks, fastener visibility, gaps, alignment, or other appearance-related expectations.

    EXAMPLES

    • Clean visible surfaces

    • Surface texture requirements

    • No exposed fasteners

    • Minimal surface defects

    • Consistent color or gloss

    • Plated, painted, or anodized finish

    • Tooling marks are unacceptable

    • Match existing component

    If appearance is not important, that is useful information too. Simply state that the design is function-first with no significant cosmetic requirements.

    Cosmetic Logo.PNG

    FIT & INTERFACE REQUIREMENTS

    WHAT DOES THE CONCEPT NEED TO FIT, CONTACT, OR INTERACT WITH?

    Fit and interface requirements describe the people, components, equipment, surfaces, or objects the concept must physically work with. This includes size ranges, contact areas, mating conditions, clearances, attachment points, and other relationships that may determine whether the concept can function successfully across its intended use range.

    EXAMPLES

    • Existing mating components

    • User size or body-fit range

    • Mounting locations

    • Contact surfaces

    • Required clearances

    • Attachment points

    • Moving interfaces

    • Alignment requirements

    • Multiple product sizes or variants

    If the concept must work across a range of users, parts, or equipment sizes, identify that range as clearly as possible.

    Assembly Logo.PNG

    USER INTERACTION

    HOW WILL THE USER HOLD OR OPERATE THE PRODUCT?

    User interaction describes how a person is expected to physically engage with the concept during normal use. This may include holding, wearing, inserting, removing, adjusting, carrying, opening, releasing, or repositioning the product. Understanding these interactions helps identify usability concerns, awkward motions, access issues, and conditions that should be evaluated during prototyping.

    EXAMPLES

    • Held or carried by hand

    • Worn on the body

    • Inserted or removed repeatedly

    • Opened or closed during use

    • Adjusted by the user

    • Operated while wearing gloves

    • Used with one hand

    • Accessed while moving

    • Serviced or repositioned

    • Exposed to repeated handling

    Describe how the product will actually be used, even if the interaction is still only an early assumption.

    Environment Logo.PNG

    USE ENVIRONMENT

    UNDER WHAT CONDITIONS WILL THE PRODUCT BE USED?

    The use environment is the physical setting and operating conditions the product is expected to encounter during normal use, storage, transportation, or service. This includes exposure to temperature, moisture, chemicals, sunlight, contamination, vibration, impact, and other environmental conditions that may affect the design.

    EXAMPLES

    • Indoor, climate-controlled use

    • Outdoor year-round exposure

    • Rain, water, or high humidity

    • Extreme heat or cold

    • Dirt, dust, mud, or debris

    • UV and sunlight exposure

    • Oil, fuel, or chemicals

    • Salt or corrosive environments

    • Continuous vibration

    • Shock or impact

    • Rough field use

    A simple description is acceptable. For example: “Used outdoors during hiking, rain, dirt, and rough handling.”

  • A Concept Review does not require the manufacturing process, material, or production volume to already be finalized. However, any current assumptions about how the product may eventually be produced are useful for evaluating feasibility, early manufacturability, prototype direction, and whether the concept is developing toward a practical production path.

    Process Logo.PNG

    PLANNED PROCESS

    WHAT IS THE PLANNED METHOD TO MANUFACTURE THIS PRODUCT?

    The planned manufacturing process is the method currently expected to be used to physically produce the part. Different processes create parts in different ways and come with different capabilities, limitations, tooling requirements, and design considerations. If a process has already been selected or is being considered, include it even if the decision is not final.

    EXAMPLES

    • Injection molding

    • CNC machining

    • Die casting

    • Sheet metal forming

    • Progressive stamping

    • Extrusion

    • Forging

    • Additive manufacturing

    • Fabrication and welding

    • A combination of processes

    If the process has not been selected, simply check the "Not Sure" box.

    Material Logo.PNG

    PLANNED MATERIAL

    WHAT IS THE PLANNED MATERIAL(s) of THIS PRODUCT?

    The planned material is the material or material family currently intended for the part. This can be as broad as aluminum, steel, or plastic, or as specific as an exact alloy, resin, or material grade. If multiple materials are being considered, include the options currently under evaluation.

    EXAMPLES

    • Aluminum

    • Carbon steel

    • Stainless steel

    • Magnesium

    • Zinc

    • ABS

    • Nylon

    • Polycarbonate

    • Polypropylene

    • Rubber or elastomer

    • Fiber-reinforced plastic

    • Composite material

    If known, include the specific grade or formulation. If unknown, check the "Not Sure" box.

    Volume Logo.PNG

    PRODUCTION VOLUME

    Approximately how many parts do you expect to PRODUCE?

    Production volume is the approximate quantity of parts expected to be produced. This may be expressed as a prototype quantity, production batch, annual volume, or estimated lifetime quantity. An exact forecast is not required. A reasonable estimate or range is sufficient.

    EXAMPLES

    • One proof-of-concept prototype

    • 5 to 20 development parts

    • 50 to 100 units for testing

    • 500 parts per year

    • 5,000 parts per year

    • 50,000 parts per year

    • 250,000 parts per year

    If the volume is uncertain, provide whatever is currently known, such as “low volume, likely fewer than 500 units per year” or “volume not yet established, but intended for eventual mass production.”

    Process Logo.PNG

    EXPECTED PROCESS

    HOW DO YOU CURRENTLY EXPECT THE PRODUCT MAY BE MADE?

    The expected process is the manufacturing method currently being considered for the product or its major components. At the concept stage, this may be little more than an early assumption. Understanding the likely process helps identify obvious conflicts between the concept and the way the product may eventually need to be produced.

    EXAMPLES

    • Injection molding

    • CNC machining

    • Die casting

    • Sheet metal forming

    • Extrusion

    • Additive manufacturing

    • Fabrication and welding

    • Casting

    • Off-the-shelf components

    • Combination of processes

    If no process has been considered yet, simply identify it as not yet determined.

    Material Logo.PNG

    MATERIAL DIRECTION

    WHAT MATERIALS ARE CURRENTLY BEING CONSIDERED?

    Material direction describes any material, material family, or general material characteristics currently being considered for the concept. A specific grade is not required. Even broad assumptions such as plastic, aluminum, steel, rubber, or flexible polymer can provide useful context when evaluating feasibility and early design direction.

    EXAMPLES

    • Aluminum

    • Carbon steel

    • Stainless steel

    • ABS

    • Nylon

    • Polycarbonate

    • Polypropylene

    • Rubber or elastomer

    • Reinforced plastic

    • Composite material

    • Material not yet selected

    If several materials are being considered, include the options and any reason one may be preferred.

    Volume Logo.PNG

    EST. PRODUCTION VOLUME

    APPROXIMATELY HOW MANY PRODUCTS MIGHT EVENTUALLY BE NEEDED?

    Expected production volume is the rough quantity the concept may eventually need to support if development is successful. At this stage, an exact forecast is not expected. A general range helps provide context for prototype strategy, manufacturing direction, design complexity, and whether the concept could reasonably scale beyond early development.

    EXAMPLES

    • One proof-of-concept prototype

    • A handful of development units

    • Fewer than 100 units

    • Hundreds per year

    • Thousands per year

    • Tens of thousands per year

    • High-volume production

    • Volume not yet known

    A rough estimate is enough. If future demand is completely unknown, simply state that production volume has not yet been established.

  • WHAT WOULD YOU LIKE THE CONCEPT REVIEW TO HELP YOU UNDERSTAND, CHALLENGE, OR CLARIFY?

    Your questions and concerns identify the areas of the concept where you want additional engineering attention. These may be uncertainties, assumptions you want challenged, functions you are unsure about, decisions that have not yet been made, or simply areas where you do not know what the next step should be.

    ​

    You do not need to diagnose the issue yourself or describe it using engineering terminology. Explain what you are trying to accomplish, what you are unsure about, or what has been difficult to work through so far. These concerns provide useful context and help Tier-1 Engineer understand where the Concept Review can provide the most value, such as:

    • “I am not sure whether this idea will work the way I expect.”

    • “I do not know the best way to make this mechanism function.”

    • “I am unsure whether this concept is too complicated.”

    • “I want to know what I should prototype first.”

    • “I am not sure what material or process makes sense yet.”

    • “I want to identify the biggest weaknesses before I spend more money.”

    • “I do not know whether this feature is actually necessary.”

    • “I am unsure how the product should attach, move, or adjust.”

    • “I have several possible directions and do not know which one to pursue.”

    • “I want to know what assumptions need to be proven before detailed design.”

    • “I do not have a specific concern. I want an experienced engineering review of the overall concept.”

    NOT SURE WHAT TO ASK?

    That is completely acceptable. A Concept Review does not require you to already know what the important engineering questions are. If your goal is simply to have the idea evaluated before committing more time, money, or design effort, state that in the submission. The review is intended to help identify the questions, risks, and unknowns that should be addressed next.

  • Design documentation is the collection of information used to communicate the product, its geometry, requirements, interfaces, and current state of development. It may range from a complete CAD and drawing package to a few sketches, prototype photos, or written notes.

    ​

    You do not need every type of documentation listed below. Submit the most current and relevant information you have. Providing multiple forms of documentation can help clarify details that may not be obvious from a single CAD model or drawing.

    USEFUL SUBMISSION MATERIALS MAY INCLUDE:

    ASSEMBLY MODELS OR DRAWINGS

    Documentation showing how multiple components fit together, interact, move, fasten, or locate relative to one another.

    PREFERRED FILE TYPES

    .STEP

    .IGES

    .X_T

    .PDF

    .PNG

    SKETCHES OR CONCEPT DRAWINGS

    Formal or informal drawings used to explain features, mechanisms, intended changes, or design ideas. Hand-drawn sketches are completely acceptable.

    PREFERRED FILE TYPES

    .PDF

    .PNG

    .JPEG

    PROTOTYPE OR PRODUCT PHOTOS

    Images showing the current physical design, assembly condition, installation, failure area, or other real-world information that may help explain the project.

    PREFERRED FILE TYPES

    .PPTX

    .PNG

    .JPEG

    DESIGN REQUIREMENTS

    Written requirements describing dimensional, functional, performance, material, cosmetic, customer, or other project expectations.

    PREFERRED FILE TYPES

    .MSG

    .DOCX

    .PNG

    .PDF

    .JPEG

    SUPPLIER FEEDBACK

    DFM comments, markups, emails, quotations, or technical questions received from manufacturers or suppliers.

    PREFERRED FILE TYPES

    .PDF

    .PNG

    .MSG

    RFQ OR QUOTING DOCUMENTS

    Information previously prepared for supplier quoting that may define expected volume, material, process, tooling, or other production assumptions.

    PREFERRED FILE TYPES

    .MSG

    .DOCX

    .PNG

    .PDF

    .JPEG

    TEST OR INSPECTION REPORTS

    Dimensional reports, prototype testing, failure information, fit checks, inspection data, or other results that provide additional context about how the current design performs.

    PREFERRED FILE TYPES

    .MSG

    .DOCX

    .PNG

    .PDF

    .JPEG

    REFERENCE DOCUMENTS OR NOTES

    Any additional information that helps explain the design, its history, known problems, previous decisions, or requirements that should be considered during the review.

    PREFERRED FILE TYPES

    .MSG

    .DOCX

    .PNG

    .PDF

    .JPEG

    WHAT SHOULD I SUBMIT?

    Start with the information that best represents the current version of the design. Avoid including obsolete files unless they provide useful background, and clearly identify any older documentation that is being submitted for reference only.

    ​

    If you are unsure whether a particular file is useful, include it or describe it in the submission. The initial assessment is used to determine whether the available documentation is sufficient and identify anything additional that may be needed before the Concept Review begins.

    ​

    You do not need a complete professional engineering package to submit. A rough CAD model, a prototype, photographs, sketches, or other supporting information may be enough to begin depending on the project.

    2D ENGINEERING DRAWINGS

    Drawings showing dimensions, tolerances, material callouts, notes, finishes, and other requirements that may not be defined by the CAD model alone.

    PREFERRED FILE TYPES

    .PDF

    .PNG

    .JPEG

    3D CAD MODELS

    Computer Aided Design.PNG

    Digital models showing the geometry of individual parts or complete assemblies. STEP and Parasolid files are preferred when available.

    PREFERRED FILE TYPES

    .IGES

    .X_T

    .STEP

    .STP

    .IGES

    .IGS

    .X_T

    2D ENGINEERING DRAWINGS

    Equal Bilateral.PNG

    Drawings showing dimensions, tolerances, material callouts, notes, finishes, and other requirements not defined by the CAD model alone.

    PREFERRED FILE TYPES

    .IGES

    .X_T

    .PDF

    .PNG

    .JPEG

    ASSEMBLY MODELS/DRAWINGS

    combine.PNG

    Documentation showing how multiple components fit together, interact, move, fasten, or locate relative to one another.

    PREFERRED FILE TYPES

    .IGES

    .X_T

    .STEP

    .IGES

    .X_T

    .PDF

    .PNG

    SKETCHES/CONCEPT DRAWINGS

    Formal or informal drawings used to explain features, mechanisms, intended changes, or design ideas. Hand-drawn sketches are acceptable.

    PREFERRED FILE TYPES

    .IGES

    .X_T

    .PDF

    .PNG

    .JPEG

    PROTOTYPE/PRODUCT PHOTOS

    Images showing the current physical design, assembly condition, installation, failure area, or other real-world information.

    PREFERRED FILE TYPES

    .IGES

    .X_T

    .PPTX

    .PNG

    .JPEG

    DESIGN REQUIREMENTS

    Written requirements describing dimensional, functional, performance, material, cosmetic, customer, or other project expectations.

    PREFERRED FILE TYPES

    .IGES

    .X_T

    .MSG

    .PNG

    .JPEG

    .DOCX

    .PDF

    SUPPLIER FEEDBACK

    DFM comments, markups, emails, quotations, or technical questions received from manufacturers or suppliers.

    PREFERRED FILE TYPES

    .IGES

    .X_T

    .PDF

    .PNG

    .MSG

    RFQ/QUOTING DOCUMENTS

    Information previously prepared for supplier quoting that may define expected volume, material, process, tooling, or other production assumptions.

    PREFERRED FILE TYPES

    .IGES

    .X_T

    .MSG

    .PNG

    .JPEG

    .DOCX

    .PDF

    TEST/INSPECTION REPORTS

    Digital Calipers.PNG

    Dimensional reports, prototype testing, failure information, fit checks, inspection data, or other results that provide additional context.

    PREFERRED FILE TYPES

    .IGES

    .X_T

    .MSG

    .PNG

    .JPEG

    .DOCX

    .PDF

    REFERENCE DOCUMENTATION

    Documents Logo_edited.jpg

    Any additional information that helps explain the design, its history, known problems, or previous decisions that should be considered during the review.

    PREFERRED FILE TYPES

    .IGES

    .X_T

    .MSG

    .PNG

    .JPEG

    .DOCX

    .PDF

  • Concept submission is the starting point for the Tier-1 Concept Review process. You will complete the Concept Review submission form, provide the information outlined in the previous steps, and upload the most relevant concept materials currently available.

    ​

    Submission does not begin the paid Concept Review. It gives Tier-1 Engineer the information needed to understand the idea, confirm that it is a good fit for the service, and establish the scope and engineering effort expected to complete the review properly.

    BEGIN YOUR CONCEPT REVIEW

    DURING INITIAL ASSESSMENT, TIER-1 ENGINEER WILL:

    CONFIRM THAT THE PROJECT FALLS WITHIN THE CONCEPT REVIEW SCOPE

    REVIEW THE SUBMITTED CONCEPT INFORMATION AND SUPPORTING MATERIAL

    EVALUATE THE CURRENT DEFINITION AND COMPLEXITY OF THE CONCEPT

    Identify missing or unclear information that may be needed

    ESTABLISH THE REVIEW SCOPE, PRICE, AND ESTIMATED LEAD TIME

    PREPARE THE INITIAL CONCEPT ASSESSMENT REPORT (ICAR)

    WHAT HAPPENS NEXT?

    If the project is accepted, you will receive the ICAR documenting the initial assessment, review scope, price, estimated lead time, and any additional information required before the technical Concept Review begins.

    ​

    You can review the ICAR before deciding whether to proceed. No paid Concept Review work begins until the ICAR is approved and payment is received.

    ​

    If the concept is not yet ready for review, additional information may be requested or a more appropriate Tier-1 Design Readiness service may be recommended.

T1E BACKGROUND.png

The process excels at producing large, lightweight, thin-walled parts with good cosmetic quality on one side and relatively low tooling cost. Common applications include packaging trays, blister packs, appliance liners, refrigerator interiors, automotive interior panels, medical trays, and point-of-purchase displays. These parts are typically produced in the thousands to hundreds of thousands, where injection molding tooling cost or lead time cannot be justified.

 

Thermoforming equipment generally consists of a sheet clamping system, a heating station, a forming station using vacuum and or pressure, a cooling stage, and a trimming operation. Tooling is typically aluminum or composite rather than hardened steel, which keeps cost and lead time low but limits precision and durability.

 

Thermoforming performs best when it is selected intentionally and designed honestly. Most production issues trace back to designs that assume injection-molding behavior from a process that fundamentally does not behave that way.

CONCEPT REVIEW

STRUCTURED ENGINEERING GUIDANCE FOR EARLY PRODUCT CONCEPTS

-EVALUATE YOUR IDEA BEFORE DETAILED DESIGN-

TIER-1

Tier-1 Concept Review Logo
T1E BACKGROUND.png

SUBMISSION AND REVIEW BOUNDARIES

Tier-1 Concept Reviews are focused on early-stage physical product ideas, mechanical concepts, and developing product designs that need practical engineering direction before detailed design, prototyping, or manufacturing commitment.

​

A concept does not need to be fully defined to be reviewable. Submitted projects are screened before paid work begins to confirm that there is enough information to understand the intended purpose, basic function, current development direction, and the questions the client wants help resolving.

​

Projects that are extremely broad, highly regulated, safety-critical, or outside the intended mechanical product-development scope may require clarification, a narrower review scope, or a different review path before proceeding.

ACCEPTABLE PROJECTS

PRODUCT IDEAS

ROUGH CONCEPTS

HAND SKETCHES

EARLY CAD

EARLY PROTOTYPES

MECHANICAL PART CONCEPTS

MECHANISM CONCEPTS

PRODUCT ENCLOSURES

BRACKETS / MOUNTS

SIMPLE ASSEMBLIES

PRODUCT IMPROVEMENT IDEAS

EARLY PRODUCT REDESIGNS

PROTOTYPE CONCEPTS

*LIST NOT EXHAUSTIVE

MAY REQUIRE CLARIFICATION

UNCLEAR PRODUCT PURPOSE

LIMITED PROJECT INFO

NO DEFINED DESIGN INTENT

LARGE/COMPLEX ASSEMBLIES

UNKNOWN REQUIREMENTS

SAFETY-CRITICAL CONCEPTS

REGULATED PRODUCTS

UNPROVEN TECHNOLOGY

MULTIPLE PRODUCT VARIANTS

CONFLICTING REQUIREMENTS

*LIST NOT EXHAUSTIVE

OUTSIDE OF REVIEW SCOPE

ELECTRICAL DESIGN

PCB DESIGN

CIRCUIT DESIGN

WIRING SCHEMATICS

FIRMWARE / SOFTWARE

APP DEVELOPMENT

EMBEDDED SYSTEM DESIGN

RF / ANTENNA DESIGN

BATTERY MANAGEMENT DESIGN

SAFETY CERTIFICATIONS

LEGAL DETERMINATIONS

STRUCTURAL PE CERTS

ARCHITECTURAL REVIEW

MEDICAL DEVICE APPROVAL

FIREARM SAFETY APPROVAL

LIVE-FIRE TEST VALIDATION

PROTOTYPE FABRICATION

FULL NPI CYCLES

SUPPLIER MANAGEMENT

PRODUCTION GUARANTEES

*LIST NOT EXHAUSTIVE

T1E BACKGROUND.png

CONFIDENTIALITY AND FAQ

INFORMATION SECURITY

A meaningful Concept Review requires an open look at the design, and that often means sharing information that is not public and should not become public. CAD models, engineering drawings, prototype images, specifications, assembly details, design concepts, and supporting documentation may represent months or years of development and significant investment.

 

That information is treated accordingly. Materials submitted to Tier-1 Engineer are used for the purpose of understanding your project, establishing the review scope, and performing the engineering work you requested. Ownership of your design and intellectual property remains with you.

 

Project information is not published, shared, repurposed for marketing, or used as portfolio material without your permission. When additional confidentiality requirements exist, NDA requests can also be furnished before sensitive project information is submitted.

 

The objective is to create an environment where you can provide the technical information necessary for a thorough, useful review without having to wonder how your design, documentation, or project details will be handled afterward.

IP SECURITY OVERVIEW

Ownership of your design stays with you

Files are used only for the requested project

Project information is treated as confidential

Nothing is published without your permission

Access is limited to what the review requires

NDA requests can be addressed before submission

CONFIDENTIALITY IS BUILT INTO EVERY REVIEW

TIER-1 DESIGN READINESS SYSTEM TERMS AND CONDITIONS

FREQUENTLY ASKED QUESTIONS

  • Yes. Concept Review is specifically intended to be accessible to inventors, makers, startups, product developers, engineers, and anyone working through a physical product idea. You do not need an engineering degree, professional title, or experience with formal product development.

  • No. Submission and initial assessment occur before paid review begins. If the concept is accepted, the ICAR establishes the approved scope, final price, estimated lead time, and any additional information needed before you decide whether to proceed.

  • Concept Reviews begin at the listed starting price for projects that fall within a typical review scope. Larger assemblies, broader concepts, extensive documentation, or projects requiring substantially greater engineering effort may cost more. Final pricing and lead time are established in the ICAR before payment.

  • Submit whatever best communicates the idea in its current state. This may include sketches, written descriptions, rough CAD, complete CAD, photos, prototype images, requirements, reference material, existing products, notes, or other information that helps explain what you are trying to accomplish.

  • The CRR provides findings, recommendations, and development direction based on the concept submitted for review. Review of substantially revised concepts, new configurations, additional concepts, or later design iterations is not automatically included and may require a separate review.

  • No. Concept Review is an engineering evaluation and guidance service, not a full product-development or CAD-design service. The review helps identify what should be clarified, changed, tested, or developed next, but Tier-1 Engineer does not take ownership of completing the design for you.

  • In most cases, yes. You can officially request an NDA in the Project Submission Form, before any documentation is uploaded. Any NDA must be reviewed and accepted before it is considered applicable to the project.

  • Very early. A finished CAD model or prototype is not required. A concept may be reviewable from sketches, written descriptions, reference images, rough models, or other early development information, provided there is enough detail to understand the problem, intended function, and general concept direction.

  • Yes. Concept Review can also be used to evaluate an early prototype, explore a new direction for an existing product, or reconsider a product concept before additional design work is performed.

  • That is completely acceptable. Concept Review occurs early enough that these decisions may still be open. Current assumptions can be provided when available, and obvious material or manufacturing-direction considerations may be identified as part of the review.

  • You will be informed during the initial assessment before paid work begins. Tier-1 Engineer may request clarification, narrow the proposed review scope, recommend a Design Review or DFM Audit, or decline projects that fall outside the intended Concept Review boundaries.

  • Typical Concept Reviews are expected to fall within the published lead-time range. Larger or unusually complex projects may require additional time. The actual estimated lead time is established in the ICAR before payment.

  • Yes. Reasonable clarification of findings and recommendations is part of review closeout. New concept evaluation, revised designs, additional analysis, or expanded development questions may require additional scope.

  • A Concept Review evaluates the idea, feasibility, major assumptions, early risks, and development direction. A Design Review evaluates a more defined design, including geometry, fit, function, interfaces, and assembly. A DFM Audit evaluates the design against the realities of the intended manufacturing process.

    ​

    Put simply: Concept Review evaluates the product direction. Design Review evaluates the design. DFM Audit evaluates the manufacturability of the design.

  • No. Sketches, descriptions, photographs, rough models, or prototypes may be enough for a Concept Review. CAD and drawings are useful when available, but requiring them would defeat the purpose of an early-stage engineering review.

  • The initial assessment is intended to identify this before paid review begins. If the concept includes a large assembly, several interacting systems, multiple product variants, or substantially more engineering effort than a typical Concept Review, the scope, price, and lead time may be adjusted in the ICAR.

  • Not automatically. The purpose of the Concept Review is to determine what appears viable, identify unresolved risks and assumptions, and establish what should happen next. The CRR may recommend proceeding, refining the concept, proving specific functions through testing, developing an early prototype, or resolving additional questions before detailed design begins.

    I especially like #8 and #15 for this page. Those two make it immediately clear that Concept Review is the service where someone can show up with an idea that is still rough, rather than feeling like they need to engineer half the product before they're qualified to ask for help.

T1E BACKGROUND.png

WHY TIER-1 ENGINEER

Early product development is often less about having every answer and more about knowing which questions need to be asked. A useful Concept Review takes experience recognizing weak assumptions, conflicting requirements, unnecessary complexity, and development paths that may create problems long before the design is mature enough for detailed engineering.

​

Tier-1 Engineer brings broad practical experience across design, manufacturing, product development, suppliers, and production environments into the earliest stages of a project. That perspective helps evaluate a concept beyond how it looks on paper, considering function, feasibility, usability, manufacturability, development risk, and what will eventually be required to turn the idea into a real product.

​

Tier-1 Concept Reviews don't simply hand you a list of good / no good items. Tier-1 Engineer places value on explaining the reasoning behind each finding, identifying what remains uncertain, and defining what should be proven next. The goal is to leave you with a clearer concept, better questions, and a practical path into the next stage of development.

WHAT THAT MEANS FOR YOUR CONCEPT REVIEW

EARLY ASSUMPTIONS ARE CHALLENGED BEFORE THEY BECOME DESIGN COMMITMENTS

THE CONCEPT IS EVALUATED FROM BOTH DESIGN AND MANUFACTURING PERSPECTIVES

PRACTICAL ENGINEERING JUDGMENT IS APPLIED WITHOUT REQUIRING A FINISHED DESIGN

FUNCTION, FEASIBILITY, USER NEEDS, AND DEVELOPMENT RISKS ARE CONSIDERED TOGETHER

FINDINGS FOCUS ON THE QUESTIONS THAT MATTER MOST AT THE CURRENT STAGE

RECOMMENDATIONS INCLUDE THE REASONING BEHIND THE NEXT STEP

No unnecessary complexity or academic, THEORY-CENTRIC LANGUAGE

T1E BACKGROUND.png

START YOUR CONCEPT REVIEW

HOW TO GET STARTED

1. Prepare your CONCEPT information

GATHER WHAT IS KNOWN ABOUT THE IDEA, INTENDED FUNCTION, USE CONDITIONS, REQUIREMENTS, CURRENT DIRECTION, AND ANY MAJOR UNKNOWNS.

2. Complete the Project Submission Form

DESCRIBE THE CONCEPT, WHAT YOU ARE TRYING TO ACCOMPLISH, WHAT CURRENTLY EXISTS, AND WHAT YOU WANT HELP UNDERSTANDING OR EVALUATING.

3. UPLOAD YOUR SUPPORTING MATERIAL

SUBMIT SKETCHES, PHOTOS, NOTES, EARLY CAD, PROTOTYPE IMAGES, REFERENCE MATERIAL, OR OTHER INFORMATION THAT HELPS EXPLAIN THE CONCEPT.

4. Tier-1 Engineer performs initial assessment

THE SUBMISSION IS REVIEWED FOR PROJECT FIT, CONCEPT DEFINITION, AVAILABLE INFORMATION, OVERALL COMPLEXITY, AND EXPECTED REVIEW EFFORT.

5. Receive your ICAR

THE INITIAL CONCEPT ASSESSMENT REPORT ESTABLISHES THE REVIEW SCOPE, PRICE, ESTIMATED LEAD TIME, MISSING INFORMATION, AND NEXT STEPS.

6. Decide whether to proceed

REVIEW THE ICAR AND MOVE FORWARD ONLY IF THE PROPOSED SCOPE, PRICE, AND TERMS MAKE SENSE FOR YOUR PROJECT.

A Concept Review begins with a simple project submission. You provide what is currently known about the idea and any supporting material, Tier-1 Engineer evaluates the concept, and you receive a defined review plan before any paid technical work begins.