THE TIER-1 DESIGN READINESS SYSTEM

T1E BACKGROUND.png

The process excels at producing large, lightweight, thin-walled parts with good cosmetic quality on one side and relatively low tooling cost. Common applications include packaging trays, blister packs, appliance liners, refrigerator interiors, automotive interior panels, medical trays, and point-of-purchase displays. These parts are typically produced in the thousands to hundreds of thousands, where injection molding tooling cost or lead time cannot be justified.

 

Thermoforming equipment generally consists of a sheet clamping system, a heating station, a forming station using vacuum and or pressure, a cooling stage, and a trimming operation. Tooling is typically aluminum or composite rather than hardened steel, which keeps cost and lead time low but limits precision and durability.

 

Thermoforming performs best when it is selected intentionally and designed honestly. Most production issues trace back to designs that assume injection-molding behavior from a process that fundamentally does not behave that way.

DFM AUDIT

MANUFACTURING-FOCUSED DESIGN REVIEW FOR PRODUCTION READINESS

-FIND MANUFACTURING ISSUES BEFORE YOU TOOL-

TIER-1

Tier-1 DFM Audit Logo
T1E BACKGROUND.png

WHAT IS A TIER-1 DFM AUDIT?

A Tier-1 DFM Audit is a structured manufacturing-focused review used to evaluate how well a design aligns with the realities of its intended production process before tooling, supplier release, or production commitment.

​

The audit examines process fit, geometry, material assumptions, tolerancing, defect risk, tooling complexity, production requirements, and other conditions that can affect how consistently and economically the part can be manufactured.

​

The goal is to identify manufacturing risks early and recommend practical corrective actions that reduce unnecessary tooling complexity, supplier changes, production defects, rework, delays, and avoidable cost.

BEGIN YOUR DFM AUDIT
T1E Consulting Logo B Transparent_edited.png

No payment is required to submit. Project fit, scope, price, and lead time are confirmed first.

DFM

WHY USE A TIER-1 DFM AUDIT

EXPOSE FEATURES THAT WILL DRIVE TOOLING OR PROCESS COMPLEXITY

FIND DEFECT RISKS BEFORE THEY BECOME RECURRING PRODUCTION PROBLEMS

FIND TOLERANCES THAT MAY EXCEED PROCESS CAPABILITY

IDENTIFY DESIGN CHOICES THAT ADD COST WITHOUT ADDING VALUE

UNDERSTAND WHERE MATERIAL, GEOMETRY, AND PROCESS ASSUMPTIONS CONFLICT

ENTER SUPPLIER AND TOOLING DISCUSSIONS WITH A STRONGER DESIGN

T1E BACKGROUND.png
T1E BACKGROUND.png

COMMON APPLICATIONS

INDEPENDENT INVENTORS

Catch manufacturing risks before investing in tooling or suppliers.

GARAGE PROTOTYPERS

Prepare proven prototypes for more repeatable, scalable manufacturing.

SERIOUS MAKERS

Check process fit, tolerances, materials, and production feasibility.

PRODUCT STARTUPS

Reduce manufacturing risk before quoting, tooling, or scale-up.

MECHANICAL ENGINEERS

Add a manufacturing checkpoint before final design release.

PRODUCT DESIGNERS

Align design choices with process capability and production realities.

OEM ENGINEERING TEAMS

Expose tooling, defect, and process risks before supplier launch.

SMALL BUSINESSES

Get practical DFM guidance without dedicated manufacturing resources.

T1E BACKGROUND.png

WHAT YOU GET

INITIAL AUDIT ASSESSMENT REPORT

The Initial Audit Assessment Report (IAAR) establishes the starting condition for a Tier-1 DFM Audit before paid technical review begins.

​

It summarizes the submitted design package, intended manufacturing process, planned material, production assumptions, available documentation, preliminary manufacturing concerns, missing information, assigned Review Level, estimated lead time, audit price, and proposed audit scope.

​

The IAAR gives the client a clear picture of how Tier-1 Engineer understands the project before the detailed audit begins. It confirms what will be evaluated, identifies information that may still be required, and provides the Review Level, scope, timing, and cost needed to make an informed decision about proceeding.

VIEW FULL SAMPLE IAAR

THE IAAR ESTABLISHES:

THE CURRENT MANUFACTURING READINESS OF THE SUBMITTED DESIGN

THE INTENDED PROCESS, MATERIAL, AND PRODUCTION DIRECTION

WHETHER THE AVAILABLE DOCUMENTATION SUPPORTS A COMPLETE AUDIT

A PRELIMINARY SUMMARY OF MANUFACTURING CONCERNS

THE APPROPRIATE REVIEW LEVEL BASED ON EXPECTED AUDIT EFFORT

A CLEARLY DEFINED SCOPE FOR THE TECHNICAL DFM AUDIT

THE PRICE AND ESTIMATED LEAD TIME BEFORE WORK BEGINS

ANY MISSING INFORMATION REQUIRED TO COMPLETE THE AUDIT

A DOCUMENTED PATH INTO THE PHASE THREE TECHNICAL AUDIT

The IAAR gives both parties a clear understanding of the submitted design, identifies any missing information, and establishes the Review Level, lead time, and cost before initiating the DFM AUDIT.

MANUFACTURABILITY AUDIT ASSESSMENT REPORT

The Manufacturability Audit Assessment Report (MAAR) is the final technical deliverable of a Tier-1 DFM Audit and contains the detailed manufacturing-focused findings developed during the audit.

​

It evaluates the submitted design across process fit, manufacturability, tolerancing, defect risk, tooling complexity, and overall project complexity, while documenting the specific conditions that create risk, unnecessary cost, or production difficulty.

​

The MAAR is intended to turn manufacturing concerns into practical engineering decisions. It explains what was identified, why the condition matters, how it may affect tooling or production, and what corrective actions should be considered before the design advances into supplier release, tooling, or production.

VIEW FULL SAMPLE MAAR

THE MAAR PROVIDES:

A CLEAR ASSESSMENT OF PROCESS FIT AND MANUFACTURABILITY

REVIEW OF TOLERANCE STRATEGY AND DIMENSIONAL RISK

IDENTIFICATION OF PROCESS-RELATED DEFECT RISKS

EVALUATION OF TOOLING AND PROCESS COMPLEXITY

IDENTIFICATION OF AVOIDABLE PRODUCTION AND COST DRIVERS

PRIORITIZED FINDINGS BASED ON MANUFACTURING IMPACT

ENGINEERING REASONING BEHIND SIGNIFICANT DFM CONCERNS

PRACTICAL CORRECTIVE ACTIONS FOR IDENTIFIED RISKS

A RECOMMENDED PATH TOWARD IMPROVED PRODUCTION READINESS

The MAAR turns the audit into an actionable manufacturing assessment, showing where risk exists, why it matters, and what changes should be considered before tooling, supplier release, or production commitment.

T1E BACKGROUND.png

REVIEW LEVELS AND PRICING

WHAT IS A REVIEW LEVEL?

Not every DFM Audit requires the same amount of manufacturing analysis or engineering effort.

​

Some projects involve a mature single part with a well-defined process and relatively straightforward manufacturing concerns. Others may involve complex geometry, tight tolerances, difficult tooling, sensitive materials, or complex requirements.

​

A Review Level is a tiered classification used to account for the anticipated effort required to properly complete the DFM Audit. It considers the amount of investigation, process-specific analysis, documentation review, and engineering judgment expected to evaluate the submitted design and develop supported manufacturing findings. Review Levels provide a consistent way to align audit effort, timing, and cost with the actual demands of the project.

​

The client does not choose the Review Level directly. The level is assigned by Tier-1 Engineer after evaluating the submitted design package.

REVIEW LEVEL DRIVERS

MANUFACTURING PROCESS SENSITIVITY

PART AND GEOMETRY COMPLEXITY

TOLERANCE AND DIMENSIONAL DEPTH

TOOLING AND PROCESS COMPLEXITY

DEFECT RISK AND PROCESS SIMPLICITY

DOCUMENTATION DEPTH

PRODUCTION REQUIREMENTS

OVERALL DFM AUDIT EFFORT

REVIEW LEVELS PROVIDE A CONSISTENT WAY TO ALIGN AUDIT EFFORT, PROJECT COMPLEXITY, TIMING, AND COST BEFORE PAID TECHNICAL WORK BEGINS.

EVERY REVIEW LEVEL FOLLOWS THE SAME DFM AUDIT PROCESS AND INCLUDES THE SAME CORE DELIVERABLES. THE ASSIGNED LEVEL REFLECTS THE ANTICIPATED ENGINEERING EFFORT REQUIRED TO PROPERLY EVALUATE THE SUBMITTED DESIGN, BASED ON MANUFACTURING COMPLEXITY, PROCESS SENSITIVITY, TOOLING CONDITIONS, TOLERANCING, DEFECT RISK, DOCUMENTATION DEPTH, AND OVERALL AUDIT SCOPE.

A HIGHER REVIEW LEVEL DOES NOT INDICATE A BETTER OR MORE COMPLETE AUDIT. IT INDICATES THAT THE PROJECT IS EXPECTED TO REQUIRE MORE MANUFACTURING ANALYSIS, INVESTIGATION, AND ENGINEERING TIME TO REACH THE SAME STANDARD OF REVIEW.

Level 1 is normally assigned when the submitted design has a straightforward manufacturing path and can be evaluated without extensive process investigation. The intended process and material are reasonably clear, the documentation package is manageable, and the number of manufacturing conditions requiring detailed analysis is limited.

​

A Level 1 project may still contain significant DFM concerns. The classification simply indicates that those concerns can reasonably be evaluated with a focused effort.

Relatively simple part or assembly

WELL-DEFINED MANUFACTURING PROCESS

LIMITED TOOLING OR PROCESS COMPLEXITY

MANAGEABLE DOCUMENTATION PACKAGE

FEW CRITICAL TOLERANCE CONDITIONS

FOCUSED OR WELL-DEFINED DFM CONCERNS

LOWER OVERALL AUDIT COMPLEXITY

WHY A PROJECT MAY BE ASSIGNED LEVEL 1

COMMON LEVEL 1 CHARACTERISTICS

FOCUSED AUDIT

TYPICAL PROJECT CHARACTERISTICS

SIMPLE PARTS

DEFINED PROCESS

FOCUSED CONCERNS

LIMITED VARIABLES

REVIEW LEVEL FACTORS

LOW COMPLEXITY

CLEAR DIRECTION

SIMPLE DIMENSIONING

SMALL FILE PACKAGE

LEAD TIME

5-7

BUSINESS DAYS

$499

Level 1 is normally assigned when the submitted design is relatively simple and can be understood without extensive investigation. The design intent is fairly clear, the documentation package is manageable, and the number of parts, interfaces, requirements, or areas requiring engineering evaluation is limited.

​

A Level 1 project may still contain meaningful design concerns. The classification simply indicates that those concerns can reasonably be evaluated and documented within a focused review effort.

Relatively simple part or assembly

Limited number of interfaces

Clearly defined design intent

Manageable documentation package

Few competing requirements

Focused or well-defined concerns

Lower overall review complexity

WHY A PROJECT MAY BE ASSIGNED LEVEL 1

COMMON LEVEL 1 CHARACTERISTICS

FOCUSED REVIEW

TYPICAL PROJECT CHARACTERISTICS

SIMPLE PARTS

EARLY PROTOTYPES

FOCUSED CONCERNS

SIMPLE ASSEMBLIES

REVIEW LEVEL FACTORS

LOW COMPLEXITY

LIMITED VARIABLES

CLEAR DESIGN INTENT

SMALL FILE PACKAGE

LEAD TIME

3-5

BUSINESS DAYS

$399

  • Level 1 is normally assigned when the submitted design has a relatively straightforward manufacturing path and can be evaluated without extensive process investigation. The intended process and material are clear, the documentation package is manageable, and the number of conditions requiring detailed analysis is limited.

    ​

    A Level 1 project may still contain significant DFM concerns. The classification simply indicates that those concerns can reasonably be evaluated and documented within a focused audit effort.

    Relatively simple part or assembly

    WELL-DEFINED MANUFACTURING PROCESS

    WELL-DEFINED MANUFACTURING PROCESS

    LIMITED TOOLING OR PROCESS COMPLEXITY

    Manageable documentation package

    FEW CRITICAL TOLERANCE CONDITIONS

    FOCUSED OR WELL-DEFINED DFM CONCERNS

    LOWER OVERALL AUDIT COMPLEXITY

    WHY A PROJECT MAY BE ASSIGNED LEVEL 1

    COMMON LEVEL 1 CHARACTERISTICS

    FOCUSED AUDIT

    TYPICAL PROJECT CHARACTERISTICS

    SIMPLE PARTS

    DEFINED PROCESS

    FOCUSED CONCERNS

    LIMITED VARIABLES

    REVIEW LEVEL FACTORS

    LOW COMPLEXITY

    CLEAR DIRECTION

    SIMPLE DIMENSIONING

    SMALL FILE PACKAGE

    LEAD TIME

    5-7

    BUSINESS DAYS

    $499

  • Level 2 is normally assigned when the submitted design requires a broader manufacturing assessment. The project may contain more complex geometry, interacting features, tighter requirements, multiple manufacturing concerns, or process conditions that require additional investigation to evaluate properly.

    ​

    More engineering effort is typically required to understand how geometry, tolerances, material behavior, tooling conditions, and expected production requirements interact before supported DFM findings can be developed.

    MODERATELY COMPLEX PART OR ASSEMBLY

    MULTIPLE MANUFACTURING RISK AREAS

    GREATER TOOLING OR PROCESS SENSITIVITY

    BROADER DOCUMENTATION PACKAGE

    MORE DEMANDING TOLERANCE REQUIREMENTS

    INTERACTING PROCESS CONDITIONS

    MODERATE OVERALL AUDIT COMPLEXITY

    WHY A PROJECT MAY BE ASSIGNED LEVEL 2

    COMMON LEVEL 2 CHARACTERISTICS

    EXPANDED AUDIT

    TYPICAL PROJECT CHARACTERISTICS

    DETAILED PART DESIGNS

    SMALL ASSEMBLIES

    MULTIPLE CONCERNS

    MULTI-FUNCTION DESIGNS

    REVIEW LEVEL FACTORS

    MODERATE COMPLEXITY

    COMPLEX TOOLING

    MANY CRITICAL FEATURES

    LARGE FILE PACKAGE

    LEAD TIME

    5-10

    BUSINESS DAYS

    $999

  • Level 3 is assigned when the project requires substantially greater manufacturing analysis than can be represented by the standard Level 1 or Level 2 audit effort. These projects may involve highly complex geometry, numerous critical features, extensive documentation, or interacting production risks.

    ​

    Additional engineering time may be required simply to understand the manufacturing relationships, investigate the relevant conditions, and develop findings with enough technical depth to be useful and defensible.

    HIGHLY COMPLEX PARTS OR ASSEMBLIES

    NUMEROUS INTERACTING DFM CONCERNS

    HIGH TOOLING OR PROCESS SENSITIVITY

    EXTENSIVE DOCUMENTATION REQUIREMENTS

    CRITICAL TOLERANCE OR DEFECT-RISK CONDITIONS

    MULTIPLE INTERACTING PRODUCTION CONSTRAINTS

    HIGH OVERALL AUDIT COMPLEXITY

    WHY A PROJECT MAY BE ASSIGNED LEVEL 3

    COMMON LEVEL 3 CHARACTERISTICS

    ADVANCED REVIEW

    TYPICAL PROJECT CHARACTERISTICS

    COMPLEX ASSEMBLIES

    MULTI-MATERIAL DESIGNS

    HIGH-RISK DESIGNS

    EXPANDED DFM NEEDS

    REVIEW LEVEL FACTORS

    HIGH COMPLEXITY

    COMPLEX TOLERANCING

    TIMING-SENSITIVE

    DEEP DOCUMENTATION

    LEAD TIME

    CUSTOM

    BUSINESS DAYS

    CUSTOM

T1E BACKGROUND.png

HOW IT WORKS

THE FOUR-PHASE SYSTEM

The Tier-1 DFM Audit uses a structured four-phase system to move the project from initial submission through manufacturing assessment and final audit delivery.

​

Before detailed technical analysis begins, the submitted design is screened for project fit, documentation readiness, intended process direction, and expected audit effort. This establishes the Review Level, audit scope, price, and lead time before the client commits to paid work.

​

Each phase has a defined purpose and decision point. The process is designed to keep the audit focused on the approved design package, intended manufacturing assumptions, identified risks, and agreed deliverables while reducing scope confusion and avoidable rework.

​

The result is a controlled DFM process that gives the client clear expectations up front and delivers practical manufacturing findings through the MAAR.

PHASE SYSTEM ADVANTAGES

CREATES CLEAR RESPONSIBILITIES AND REVIEW CHECKPOINTS

PROJECT FIT AND REVIEW LEVEL ARE ESTABLISHED BEFORE PAYMENT

AUDIT SCOPE, PRICE, AND LEAD TIME ARE DEFINED UP FRONT

MANUFACTURING ASSUMPTIONS ARE CONFIRMED BEFORE ANALYSIS

MISSING OR UNCLEAR INFORMATION IS IDENTIFIED EARLY

PAID AUDIT WORK BEGINS ONLY AFTER CLIENT APPROVAL OF IAAR

PROVIDES A CONTROLLED, PREDICTABLE CLIENT EXPERIENCE

DFM AUDIT PHASES

Tier-1 DFM Audit Phase One Overview

WHAT YOU DO:

Gather required information, fill out the DFM AUDIT Project Submission form, upload documentation, and submit the form.

Tier-1 DFM Audit Phase Two Overview

WHAT YOU DO:

Wait for confirmation of Project Fit and/or IAAR delivery via Email. Review the IAAR, and pay to approve and INITIATE THE FORMAL DFM AUDIT.

Tier-1 DFM Audit Phase Three Overview

WHAT YOU DO:

WAIT FOR Tier-1 Engineer TO COMPLETE the full, detailed DFM AUDIT of your project submission package, and compile findings in the MAAR.

Tier-1 DFM Audit Phase Four Overview

WHAT YOU DO:

You receive the MAAR, with all AUDIT findings and recommended actions. The DFM AUDIT closes, unless clarification is requested.

DETAILED PHASE OVERVIEW

DFM AUDIT - PHASE 1 CARD.PNG

WHAT YOU DO:

Gather required information, fill out the DFM AUDIT Project Submission form, upload documentation, and submit the form.

DFM AUDIT - PHASE 2 CARD.PNG
DFM AUDIT - PHASE 3 CARD.PNG
DFM AUDIT - PHASE 4 CARD.PNG

WHAT YOU DO:

Wait for confirmation of Project Fit and/or IAAR delivery via Email. Review the IAAR, and pay to approve and INITIATE THE FORMAL DFM AUDIT.

WHAT YOU DO:

WAIT FOR Tier-1 Engineer TO COMPLETE the full, detailed DFM AUDIT of your project submission package, and compile findings in the MAAR.

WHAT YOU DO:

You receive the MAAR, with all DFM findings and recommended actions. The DFM AUDIT closes, unless clarification is requested.

T1E BACKGROUND.png

HOW TO BEGIN

GUIDED SUBMISSION METHOD

Starting a DFM Audit does not require a perfect production package or every manufacturing decision already finalized. The goal is to provide enough information to understand what the part must do, how it is expected to be produced, what process and material assumptions already exist, and what documentation is available to support the audit.

​

The steps below are designed to help organize that information before submission. Each section explains what to provide, what the terminology means, and the level of detail that is useful. If something is unknown, undecided, or still being evaluated, that is completely acceptable. Simply provide what is currently known.

​

A well-prepared submission helps Tier-1 Engineer understand the manufacturing direction faster, identify missing information early, and establish the appropriate Review Level before paid audit work begins.

THE PROJECT SUBMISSION FORM

The DFM Audit Project Submission Form provides the context needed to understand the manufacturing situation before detailed analysis begins. CAD and drawings show geometry, but they do not always explain the intended process, material, production volume, supplier concerns, or manufacturing assumptions behind the design.

​

Providing as much relevant detail as possible helps reduce assumptions, limit unnecessary back-and-forth, identify missing information early, and establish the correct Review Level.

​

You do not need to have every production decision finalized. If something is unknown or still being considered, simply say so. A complete and accurate submission gives the audit the strongest possible starting point.

BEGIN YOUR DFM AUDIT

EXPLORE THE STEPS BELOW TO PREPARE FOR A TIER-1 DFM AUDIT SUBMISSION

  • This establishes the purpose and functional expectations of the design. It includes the design intent, performance requirements, and any special requirements or constraints that define what the part, product, or assembly needs to do and what conditions must be satisfied for the design to be considered successful.

    Design Intent Logo.PNG

    DESIGN INTENT

    What is this part or assembly supposed to accomplish?

    Design intent is the basic purpose of the design and the result it is expected to achieve. It explains why the design exists and what must happen for it to be considered successful. Understanding design intent provides the reference point for evaluating whether the geometry, features, interfaces, and overall design actually support that purpose.

    EXAMPLES

    • Hold a sensor in a static position

    • Seal a fluid passage

    • Support a specified load

    • Protect internal components

    • Connect two assemblies

    • Allow repeated opening/closing

    Design intent gives the audit a reference point. A design cannot be evaluated effectively without understanding what it is expected to accomplish.

    Performance Logo.PNG

    PERFORMANCE REQUIREMENTS

    WHAT DOES THE DESIGN NEED TO WITHSTAND OR ACHIEVE?

    Performance requirements are the measurable or practical conditions the design must satisfy while doing its job. These may involve strength, movement, temperature, pressure, accuracy, durability, sealing, weight, or other functional expectations. They help define what "working correctly" actually means.

    EXAMPLES

    • Loads or forces

    • Pressure

    • Temperature

    • Speed or movement

    • Expected life or number of cycles

    • Required stiffness

    • Sealing requirements

    • Impact resistance

    • Weight targets

    • Dimensional accuracy

    • Expected service life

    Exact values are helpful when available, but they are not required for every submission.

    Special Requirements Logo.PNG

    SPECIAL

    REQUIREMENTS

    ARE THERE SPECIFIC CONDITIONS THE DESIGN MUST SATISFY?

    Special requirements are project-specific conditions that may not be obvious from the geometry alone but limit what can be changed or influence how the design must function. These requirements help prevent recommendations that conflict with something important to the project.

    EXAMPLES

    • Maximum size or weight

    • Required mounting locations

    • Regulatory constraints

    • Customer requirements

    • Appearance requirements

    • Serviceability

    • Tool access

    • Required clearances

    • Existing mating components

    • Packaging limitations

    • Features that cannot be changed

    If a requirement is important to the project, include it even if it does not seem technical.

  • This establishes the current production direction for the design. It includes the intended manufacturing process, planned material, and expected production volume that provide the baseline for evaluating process fit, manufacturability, tooling requirements, and production risk.

    Process Logo.PNG

    TARGETED

    PROCESS

    HOW IS THE PART EXPECTED TO BE MANUFACTURED?

    The targeted process is the manufacturing method currently intended to produce the part. Different processes have different capabilities, limitations, tooling requirements, and design rules. Identifying the planned process gives the audit the context needed to evaluate whether the part geometry and requirements are reasonably aligned with how it is expected to be made.

    EXAMPLES

    • Injection molding

    • CNC machining

    • Die casting

    • Stamping / forming

    • Extrusion

    • Forging

    • Sand casting

    • Investment casting

    • Additive manufacturing

    • Fabrication / welding

    If more than one process is being considered, include each option and identify the current preference.

    Material Logo.PNG

    PLANNED

    MATERIAL

    WHAT MATERIAL IS THE PART EXPECTED TO USE?

    The planned material is the material, alloy, resin, or material family currently intended for the part. Material selection influences strength, stiffness, dimensional behavior, process capability, tooling conditions, surface quality, and other manufacturing considerations. A specific grade is helpful when known, but a general material family is sufficient if selection is still being refined.

    EXAMPLES

    • Aluminum

    • Carbon steel

    • Stainless steel

    • Zinc

    • Magnesium

    • ABS

    • Polycarbonate

    • Nylon

    • Polypropylene

    • Acetal

    • Elastomers

    • Reinforced polymers

    If the material is not final, provide the current choice or the materials being considered.

    Volume Logo.PNG

    PRODUCTION VOLUME

    HOW MANY PARTS ARE EXPECTED TO BE PRODUCED?

    Production volume is the approximate quantity of parts expected to be manufactured over a run, year, or product lifetime. Volume can strongly influence process selection, tooling strategy, automation, part cost, and the level of manufacturing complexity that is practical for the project. An exact forecast is not required for the audit.

    EXAMPLES

    • Prototype quantities

    • 10–50 parts

    • 100–500 parts

    • 1,000 parts / year

    • 5,000 parts / year

    • 25,000 parts / year

    • 100,000+ parts / year

    • High-volume production

    A reasonable estimate or production range is sufficient if final volumes have not been established.

  • A DFM Audit should include the requirements that will directly affect how the design is manufactured, inspected, finished, and accepted. These include the dimensional and tolerance requirements, cosmetic and surface expectations, and any supplier or production requirements already established for the project. Requirements do not need to be fully finalized, but current assumptions, known limits, and areas that are still undecided are all useful information for the audit.

    Equal Bilateral.PNG

    DIMENSIONS &
    TOLERANCES

    WHICH DIMENSIONS/TOLERANCES ARE IMPORTANT TO THE part?

    Dimensions and tolerances define the allowable size, location, orientation, fit, and variation of important features. Identifying which dimensions are truly critical helps the audit distinguish necessary precision from requirements that may create unnecessary manufacturing difficulty or cost.

    EXAMPLES

    • Critical dimensions

    • Hole locations

    • Fits and clearances

    • Flatness requirements

    • Parallelism / perpendicularity

    • Concentricity

    • Sealing surfaces

    • Mating interfaces

    • Press or slip fits

    • Overall size limits

    • GD&T requirements

    If exact tolerances are not yet defined, identify the features or relationships that are most important to function.

    Cosmetic Logo.PNG

    COSMETIC

    REQUIREMENTS

    WHAT SURFACE CONDITIONS MUST THE FINISHED PART MEET?

    Cosmetic and surface requirements define the expected appearance, texture, finish, or visible quality of the final part. These requirements may affect tooling, process settings, secondary operations, inspection, allowable defects, and production cost. Clearly identifying important surfaces helps separate true cosmetic requirements from areas where normal manufacturing variation is acceptable.

    EXAMPLES

    • Class-A or visible surfaces

    • Surface texture

    • Color or gloss

    • Surface finish

    • Plating or anodizing

    • Painting or coating

    • Minimal tooling marks

    • Controlled parting lines

    • Limited sink or distortion

    • Scratch-free surfaces

    • Appearance matching

    If cosmetic appearance is not important, state that the part is function-first with no special surface requirements.

    Special Requirements Logo.PNG

    PRODUCTION

    REQUIREMENTS

    ARE THERE EXISTING PRODUCTION CONDITIONS TO MEET?

    Supplier and production requirements are established conditions that may affect how the part must be manufactured, inspected, handled, or delivered. These may come from an existing supplier, customer, production system, tooling strategy, quality plan, or prior manufacturing decision and can create constraints that are not obvious from CAD alone.

    EXAMPLES

    • Existing supplier requirements

    • Required secondary operations

    • Inspection requirements

    • Existing equipment limitations

    • Packaging requirements

    • Customer standards

    • Required cycle-time targets

    • Automation requirements

    • Existing production tooling

    • Supplier DFM feedback

    Include any supplier comments, RFQ conditions, or known production constraints that may influence how the design can be manufactured.

  • What would you like the DFM AUDIT to help you understand, verify, or improve?

    Your questions and concerns identify the manufacturing areas you want additional attention placed on during the audit. These may be known production risks, supplier concerns, tolerance questions, tooling issues, process uncertainties, cost drivers, or simply areas where you are not confident the design is ready to move forward.

    ​

    You do not need to diagnose the manufacturing problem yourself or describe it using technical terminology. Explain what you are seeing, what you are unsure about, or what prompted you to request a DFM Audit. These concerns provide useful context and help Tier-1 Engineer understand what matters most to the project. Provide as much detail as you are able, but simple statements are often enough to direct the focus of the audit, such as:

    • “I am worried this feature will be difficult to manufacture.”

    • “The supplier says this tolerance may be too tight.”

    • “I am concerned about tooling complexity or cost.”

    • “I want to know if this material makes sense for the process.”

    • “The prototype works, but I am not sure it will scale to production.”

    • “I am concerned this feature may create recurring defects.”

    • “The quote came back higher than expected and I want to understand why.”

    • “I want to reduce secondary operations or unnecessary processing.”

    • “I am preparing to send the design out for supplier quoting.”

    • “I want to know what manufacturing risks I may be overlooking.”

    • “I do not have a specific concern. I want an experienced manufacturing review of the overall design.”

    NOT SURE WHAT TO ASK?

    That is completely acceptable. A DFM Audit does not require you to already know where the manufacturing problems are. If your goal is simply to have the design evaluated against the intended process before committing to tooling, suppliers, or production, state that in the submission. The audit is intended to help identify manufacturing risks you may not know to look for.

  • Design documentation is the collection of information used to communicate the product, its geometry, requirements, interfaces, and current state of development. It may range from a complete CAD and drawing package to a few sketches, prototype photos, or written notes.

    ​

    You do not need every type of documentation listed below. Submit the most current and relevant information you have. Providing multiple forms of documentation can help clarify details that may not be obvious from a single CAD model or drawing.

    USEFUL SUBMISSION MATERIALS MAY INCLUDE:

    3D CAD MODELS

    Computer Aided Design.PNG

    Digital models showing the geometry of individual parts or complete assemblies. STEP and Parasolid files are preferred when available.

    PREFERRED FILE TYPES

    .STEP

    .IGES

    .X_T

    2D ENGINEERING DRAWINGS

    Equal Bilateral.PNG

    Drawings showing dimensions, tolerances, material callouts, notes, finishes, and other requirements that may not be defined by the CAD model alone.

    PREFERRED FILE TYPES

    .PDF

    .PNG

    .JPEG

    ASSEMBLY MODELS OR DRAWINGS

    combine.PNG

    Documentation showing how multiple components fit together, interact, move, fasten, or locate relative to one another.

    PREFERRED FILE TYPES

    .STEP

    .IGES

    .X_T

    .PDF

    .PNG

    SKETCHES OR CONCEPT DRAWINGS

    Formal or informal drawings used to explain features, mechanisms, intended changes, or design ideas. Hand-drawn sketches are completely acceptable.

    PREFERRED FILE TYPES

    .PDF

    .PNG

    .JPEG

    PROTOTYPE OR PRODUCT PHOTOS

    Images showing the current physical design, assembly condition, installation, failure area, or other real-world information that may help explain the project.

    PREFERRED FILE TYPES

    .PPTX

    .PNG

    .JPEG

    DESIGN REQUIREMENTS

    Written requirements describing dimensional, functional, performance, material, cosmetic, customer, or other project expectations.

    PREFERRED FILE TYPES

    .MSG

    .DOCX

    .PNG

    .PDF

    .JPEG

    SUPPLIER FEEDBACK

    DFM comments, markups, emails, quotations, or technical questions received from manufacturers or suppliers.

    PREFERRED FILE TYPES

    .PDF

    .PNG

    .MSG

    RFQ OR QUOTING DOCUMENTS

    Information previously prepared for supplier quoting that may define expected volume, material, process, tooling, or other production assumptions.

    PREFERRED FILE TYPES

    .MSG

    .DOCX

    .PNG

    .PDF

    .JPEG

    TEST OR INSPECTION REPORTS

    Digital Calipers.PNG

    Dimensional reports, prototype testing, failure information, fit checks, inspection data, or other results that provide additional context about how the current design performs.

    PREFERRED FILE TYPES

    .MSG

    .DOCX

    .PNG

    .PDF

    .JPEG

    REFERENCE DOCUMENTS OR NOTES

    Documents Logo.PNG

    Any additional information that helps explain the design, its history, known problems, previous decisions, or requirements that should be considered during the review.

    PREFERRED FILE TYPES

    .MSG

    .DOCX

    .PNG

    .PDF

    .JPEG

    WHAT SHOULD I SUBMIT?

    Start with the information that best represents the current version of the design. Avoid including obsolete files unless they provide useful background, and clearly identify any older documentation that is being submitted for reference only.

    ​

    If you are unsure whether a particular file is useful, include it or describe it in the submission. The initial assessment is used to determine whether the available documentation is sufficient and identify anything additional that may be needed before the Design Review begins.

    ​

    You do not need a complete professional engineering package to submit. A well-defined CAD model, a prototype, photographs, sketches, or other supporting information may be enough to begin depending on the project.

  • Project submission is the starting point for the Tier-1 DFM Audit process. You will complete the DFM Audit submission form, provide the project and manufacturing information outlined in the previous steps, and upload the most relevant design documentation currently available.

    ​

    Submission does not begin the paid DFM Audit. It gives Tier-1 Engineer the information needed to understand the design, confirm that it is appropriate for manufacturing analysis, and determine the engineering effort expected to complete the audit properly.

    BEGIN YOUR DFM AUDIT

    DURING INITIAL ASSESSMENT, TIER-1 ENGINEER WILL:

    CONFIRM THAT THE PROJECT FALLS WITHIN THE DFM AUDIT SCOPE

    Review the submitted project information and documentation

    EVALUATE THE MANUFACTURING DIRECTION AND PROJECT COMPLEXITY

    Identify missing or unclear information that may be needed

    Determine the appropriate Review Level

    PREPARE THE INITIAL AUDIT ASSESSMENT REPORT (IAAR)

    WHAT HAPPENS NEXT?

    If the project is accepted, you will receive the IAAR documenting the initial assessment, assigned Review Level, price, estimated lead time, and any additional information required before the technical audit begins.

    ​

    You can review the IAAR before deciding whether to proceed. No paid DFM Audit work begins until the IAAR is approved and payment is received.

    ​

    If the project is not yet ready for a DFM Audit, additional information may be requested or a more appropriate Tier-1 Design Readiness service may be recommended.

T1E BACKGROUND.png

HOW TO BEGIN

GUIDED SUBMISSION METHOD

Starting a DFM Audit does not require a perfect production package or every manufacturing decision already finalized. The goal is to provide enough information to understand what the part must do, how it is expected to be produced, and what documentation is available to support the audit.

​

The steps below are designed to help organize that information before submission. Each section explains what to provide, what the terminology means, and the level of detail that is useful. If something is unknown, undecided, or still being evaluated, that is completely acceptable. Simply provide what is currently known.

​

A well-prepared submission helps Tier-1 Engineer understand the manufacturing direction faster, identify missing information early, and establish the appropriate Review Level before paid audit work begins.

THE PROJECT SUBMISSION FORM

The DFM Audit Project Submission Form provides the context needed to understand the manufacturing situation before detailed analysis begins. CAD and drawings show geometry, but they do not always explain the intended process, material, production volume, critical requirements, supplier concerns, or manufacturing assumptions behind the design.

​

Providing as much relevant detail as possible helps reduce assumptions, limit unnecessary back-and-forth, identify missing information early, and establish the correct Review Level.

​

You do not need to have every production decision finalized. If something is unknown or still being considered, simply say so. A complete and accurate submission gives the audit the strongest possible starting point.

BEGIN YOUR DFM AUDIT

EXPLORE THE STEPS BELOW TO PREPARE FOR A TIER-1 DFM AUDIT SUBMISSION

  • This establishes the purpose and functional expectations of the design. It includes the design intent, performance requirements, and any special requirements or constraints that define what the part, product, or assembly needs to do and what conditions must be satisfied for the design to be considered successful.

    Design Intent Logo.PNG

    DESIGN INTENT

    What is this part or assembly supposed to accomplish?

    Design intent is the basic purpose of the design and the result it is expected to achieve. It explains why the design exists and what must happen for it to be considered successful. Understanding design intent provides the reference point for evaluating whether the geometry, features, interfaces, and overall design actually support that purpose.

    EXAMPLES

    • Hold a sensor in a static position

    • Seal a fluid passage

    • Support a specified load

    • Protect internal components

    • Connect two assemblies

    • Allow repeated opening/closing

    Design intent gives the audit a reference point. A design cannot be evaluated effectively without understanding what it is expected to accomplish.

    Performance Logo.PNG

    PERFORMANCE REQUIREMENTS

    WHAT DOES THE DESIGN NEED TO WITHSTAND OR ACHIEVE?

    Performance requirements are the measurable or practical conditions the design must satisfy while doing its job. These may involve strength, movement, temperature, pressure, accuracy, durability, sealing, weight, or other functional expectations. They help define what "working correctly" actually means.

    EXAMPLES

    • Loads or forces

    • Pressure

    • Temperature

    • Speed or movement

    • Expected life or number of cycles

    • Required stiffness

    • Sealing requirements

    • Impact resistance

    • Weight targets

    • Dimensional accuracy

    • Expected service life

    Exact values are helpful when available, but they are not required for every submission.

    Special Requirements Logo.PNG

    SPECIAL

    REQUIREMENTS

    ARE THERE SPECIFIC CONDITIONS THE DESIGN MUST SATISFY?

    Special requirements are project-specific conditions that may not be obvious from the geometry alone but limit what can be changed or influence how the design must function. These requirements help prevent recommendations that conflict with something important to the project.

    EXAMPLES

    • Maximum size or weight

    • Required mounting locations

    • Regulatory constraints

    • Customer requirements

    • Appearance requirements

    • Serviceability

    • Tool access

    • Required clearances

    • Existing mating components

    • Packaging limitations

    • Features that cannot be changed

    If a requirement is important to the project, include it even if it does not seem technical.

  • This establishes the current production direction for the design. It includes the intended manufacturing process, planned material, and expected production volume that provide the baseline for evaluating process fit, manufacturability, tooling requirements, and production risk.

    Environment Logo.PNG

    USE ENVIRONMENT

    UNDER WHAT CONDITIONS WILL THE PRODUCT BE USED?

    The use environment is the physical setting and operating conditions the product is expected to encounter during normal use, storage, transportation, or service. This includes exposure to temperature, moisture, chemicals, sunlight, contamination, vibration, impact, and other environmental conditions that may affect the design.

    EXAMPLES

    • Indoor, climate-controlled use

    • Outdoor year-round exposure

    • Rain, water, or high humidity

    • Extreme heat or cold

    • Dirt, dust, mud, or debris

    • UV and sunlight exposure

    • Oil, fuel, or other chemicals

    • Salt or corrosive environments

    • Continuous vibration

    • Shock or impact

    • Automotive or underhood

    A simple description is acceptable. For example:
    “Mounted outdoors year-round."

    Assembly Logo.PNG

    INSTALLATION REQUIREMENTS

    How does the design assemble, attach, OR INSTALL?

    Assembly requirements describe how the part or product connects to other components and what must happen during installation, assembly, adjustment, maintenance, or disassembly. This includes fasteners, mating features, alignment, access, clearances, assembly order, tooling, and any components the design must interface with.

    EXAMPLES

    • Bolts to an existing surface

    • Snaps into another component

    • Assembled without special tools

    • Requires tool access

    • Must align with existing features

    • Removable for maintenance

    • Assembled in a specific sequence

    • Must prevent incorrect assembly

    • One person assembly

    Exact values are helpful when available, but they are not required for every submission.

    Cosmetic Logo.PNG

    COSMETIC REQUIREMENTS

    WHAT APPEARANCE EXPECTATIONS does the design need to meet?

    Cosmetic requirements define how the finished product is expected to look and which surfaces or features are visually important. These requirements may involve surface finish, texture, color, gloss, visible defects, parting lines, witness marks, fastener visibility, gaps, alignment, or other appearance-related expectations.

    EXAMPLES

    • Clean visible surfaces

    • Surface texture requirements

    • No exposed fasteners

    • Minimal surface defects

    • Consistent color or gloss

    • Plated, painted, or anodized finish

    • Tooling marks are unacceptable

    • Match existing component

    If appearance is not important, that is useful information too. Simply state that the design is function-first with no significant cosmetic requirements.

    Volume Logo.PNG

    PRODUCTION VOLUME

    HOW MANY PARTS ARE EXPECTED TO BE PRODUCED?

    Production volume is the approximate quantity of parts expected to be manufactured over a run, year, or product lifetime. Volume can strongly influence process selection, tooling strategy, automation, part cost, and the level of manufacturing complexity that is practical for the project. An exact forecast is not required for the audit.

    EXAMPLES

    • Prototype quantities

    • 10–50 parts

    • 100–500 parts

    • 1,000 parts / year

    • 5,000 parts / year

    • 25,000 parts / year

    • 100,000+ parts / year

    A reasonable estimate or production range is sufficient if final volumes have not been established.

    Material Logo.PNG

    PLANNED

    MATERIAL

    WHAT MATERIAL IS THE PART EXPECTED TO USE?

    The planned material is the material, alloy, resin, or material family currently intended for the part. Material selection influences strength, stiffness, dimensional behavior, process capability, surface quality, and other manufacturing considerations. A specific grade is helpful when known, but a general material family is sufficient if selection is still being refined.

    EXAMPLES

    • Aluminum

    • Carbon steel

    • Stainless steel

    • Zinc

    • ABS

    • Polycarbonate

    • Nylon

    • Polypropylene

    • Acetal

    • Reinforced polymers

    If the material is not final, provide the current choice or the materials being considered.

    Process Logo.PNG

    TARGETED

    PROCESS

    HOW IS THE PART EXPECTED TO BE MANUFACTURED?

    The targeted process is the manufacturing method currently intended to produce the part. Different processes have different capabilities, limitations, tooling requirements, and design rules. Identifying the planned process gives the audit the context needed to evaluate whether the part geometry and requirements are aligned with how it is expected to be made.

    EXAMPLES

    • Injection molding

    • CNC machining

    • Die casting

    • Stamping / forming

    • Extrusion

    • Forging

    • Sand casting

    • Investment casting

    • Additive manufacturing

    • Fabrication / welding

    If more than one process is being considered, include each option and identify the current preference.

  • A DFM Audit should include the requirements that will directly affect how the design is manufactured, inspected, finished, and accepted. These include the dimensional and tolerance requirements, cosmetic and surface expectations, and any supplier or production requirements already established for the project.

    ​

    Requirements do not need to be fully finalized, but current assumptions, known limits, and areas that are still undecided are all useful information for the audit.

    Process Logo.PNG

    PLANNED PROCESS

    WHAT IS THE PLANNED METHOD TO MANUFACTURE THIS PRODUCT?

    The planned manufacturing process is the method currently expected to be used to physically produce the part. Different processes create parts in different ways and come with different capabilities, limitations, tooling requirements, and design considerations. If a process has already been selected or is being considered, include it even if the decision is not final.

    EXAMPLES

    • Injection molding

    • CNC machining

    • Die casting

    • Sheet metal forming

    • Progressive stamping

    • Extrusion

    • Forging

    • Additive manufacturing

    • Fabrication and welding

    • A combination of processes

    If the process has not been selected, simply check the "Not Sure" box.

    Material Logo.PNG

    PLANNED MATERIAL

    WHAT IS THE PLANNED MATERIAL(s) of THIS PRODUCT?

    The planned material is the material or material family currently intended for the part. This can be as broad as aluminum, steel, or plastic, or as specific as an exact alloy, resin, or material grade. If multiple materials are being considered, include the options currently under evaluation.

    EXAMPLES

    • Aluminum

    • Carbon steel

    • Stainless steel

    • Magnesium

    • Zinc

    • ABS

    • Nylon

    • Polycarbonate

    • Polypropylene

    • Rubber or elastomer

    • Fiber-reinforced plastic

    • Composite material

    If known, include the specific grade or formulation. If unknown, check the "Not Sure" box.

    Volume Logo.PNG

    PRODUCTION VOLUME

    Approximately how many parts do you expect to PRODUCE?

    Production volume is the approximate quantity of parts expected to be produced. This may be expressed as a prototype quantity, production batch, annual volume, or estimated lifetime quantity. An exact forecast is not required. A reasonable estimate or range is sufficient.

    EXAMPLES

    • One proof-of-concept prototype

    • 5 to 20 development parts

    • 50 to 100 units for testing

    • 500 parts per year

    • 5,000 parts per year

    • 50,000 parts per year

    • 250,000 parts per year

    If the volume is uncertain, provide whatever is currently known, such as “low volume, likely fewer than 500 units per year” or “volume not yet established, but intended for eventual mass production.”

    Equal Bilateral_edited_edited.jpg

    DIMENSIONS &

    TOLERANCES

    WHICH DIMENSIONS, FITS, OR TOLERANCES ARE IMPORTANT TO THE PRODUCT?

    Dimensions and tolerances define the allowable size, location, orientation, fit, and variation of important features. Some requirements may be driven by function, assembly, sealing, appearance, or mating components. Identifying which dimensions are truly critical helps the audit distinguish necessary precision from requirements that may create unnecessary manufacturing difficulty.

    EXAMPLES

    • Critical dimensions

    • Hole locations

    • Fits and clearances

    • Flatness requirements

    • Parallelism / perpendicularity

    • Concentricity

    • Sealing surfaces

    • Mating interfaces

    • Press or slip fits

    • Overall size limits

    • GD&T requirements

    If exact tolerances are not yet defined, identify the features or relationships that are most important to function.

    Cosmetic Logo.PNG

    COSMETIC REQUIREMENTS

    WHAT APPEARANCE CONDITIONS MUST THE FINISHED PART MEET?

    Cosmetic and surface requirements define the expected appearance, texture, finish, or visible quality of the manufactured part. Clearly identifying important surfaces helps separate true cosmetic requirements from areas where normal manufacturing variation is acceptable.

    EXAMPLES

    • Class-A or visible surfaces

    • Surface texture

    • Color or gloss

    • Surface finish

    • Plating or anodizing

    • Painting or coating

    • Minimal tooling marks

    • Controlled parting lines

    • Limited sink or distortion

    • Scratch-free surfaces

    • Appearance matching

    If cosmetic appearance is not important, state that the part is function-first with no special surface requirements.

    Volume Logo.PNG

    PRODUCTION REQUIREMENTS

    ARE THERE EXISTING PRODUCTION CONDITIONS THE DESIGN MUST SUPPORT?

    Supplier and production requirements are established conditions that may affect how the part must be manufactured, inspected, handled, or delivered. These may come from an existing supplier, customer, tooling strategy, quality plan, or prior decisions and can create constraints that are not obvious from CAD alone.

    EXAMPLES

    • Existing supplier requirements

    • Required secondary operations

    • Inspection requirements

    • Existing equipment limitations

    • Packaging requirements

    • Customer manufacturing standards

    • Required cycle-time targets​

    • Existing production tooling

    • Supplier DFM feedback

    Include any supplier comments, RFQ conditions, or known production constraints that may influence how the design can be manufactured.

  • What would you like the DFM AUDIT to help you understand, verify, or improve?

    Your questions and concerns identify the manufacturing areas you want additional attention placed on during the audit. These may be known production risks, supplier concerns, tolerance questions, tooling issues, process uncertainties, cost drivers, or simply areas where you are not confident the design is ready to move forward.

    ​

    You do not need to diagnose the manufacturing problem yourself or describe it using technical terminology. Explain what you are seeing, what you are unsure about, or what prompted you to request a DFM Audit. These concerns provide useful context and help Tier-1 Engineer understand what matters most to the project. Provide as much detail as you are able, but simple statements are often enough to direct the focus of the audit, such as:

    • “I am worried this feature will be difficult to manufacture.”

    • “The supplier says this tolerance may be too tight.”

    • “I am concerned about tooling complexity or cost.”

    • “I want to know if this material makes sense for the process.”

    • “The prototype works, but I am not sure it will scale to production.”

    • “I am concerned this feature may create recurring defects.”

    • “The quote came back higher than expected and I want to understand why.”

    • “I want to reduce secondary operations or unnecessary processing.”

    • “I am preparing to send the design out for supplier quoting.”

    • “I want to know what manufacturing risks I may be overlooking.”

    • “I do not have a specific concern. I want an experienced manufacturing review of the overall design.”

    NOT SURE WHAT TO ASK?

    That is completely acceptable. A DFM Audit does not require you to already know where the manufacturing problems are. If your goal is simply to have the design evaluated against the intended process before committing to tooling, suppliers, or production, state that in the submission. The audit is intended to help identify manufacturing risks you may not know to look for.

  • Design documentation is the collection of information used to communicate the product, its geometry, requirements, interfaces, and current state of development. It may range from a complete CAD and drawing package to a few sketches, prototype photos, or written notes.

    ​

    You do not need every type of documentation listed below. Submit the most current and relevant information you have. Providing multiple forms of documentation can help clarify details that may not be obvious from a single CAD model or drawing.

    USEFUL SUBMISSION MATERIALS MAY INCLUDE:

    ASSEMBLY MODELS OR DRAWINGS

    Documentation showing how multiple components fit together, interact, move, fasten, or locate relative to one another.

    PREFERRED FILE TYPES

    .STEP

    .IGES

    .X_T

    .PDF

    .PNG

    SKETCHES OR CONCEPT DRAWINGS

    Formal or informal drawings used to explain features, mechanisms, intended changes, or design ideas. Hand-drawn sketches are completely acceptable.

    PREFERRED FILE TYPES

    .PDF

    .PNG

    .JPEG

    PROTOTYPE OR PRODUCT PHOTOS

    Images showing the current physical design, assembly condition, installation, failure area, or other real-world information that may help explain the project.

    PREFERRED FILE TYPES

    .PPTX

    .PNG

    .JPEG

    DESIGN REQUIREMENTS

    Written requirements describing dimensional, functional, performance, material, cosmetic, customer, or other project expectations.

    PREFERRED FILE TYPES

    .MSG

    .DOCX

    .PNG

    .PDF

    .JPEG

    SUPPLIER FEEDBACK

    DFM comments, markups, emails, quotations, or technical questions received from manufacturers or suppliers.

    PREFERRED FILE TYPES

    .PDF

    .PNG

    .MSG

    RFQ OR QUOTING DOCUMENTS

    Information previously prepared for supplier quoting that may define expected volume, material, process, tooling, or other production assumptions.

    PREFERRED FILE TYPES

    .MSG

    .DOCX

    .PNG

    .PDF

    .JPEG

    TEST OR INSPECTION REPORTS

    Dimensional reports, prototype testing, failure information, fit checks, inspection data, or other results that provide additional context about how the current design performs.

    PREFERRED FILE TYPES

    .MSG

    .DOCX

    .PNG

    .PDF

    .JPEG

    REFERENCE DOCUMENTS OR NOTES

    Any additional information that helps explain the design, its history, known problems, previous decisions, or requirements that should be considered during the review.

    PREFERRED FILE TYPES

    .MSG

    .DOCX

    .PNG

    .PDF

    .JPEG

    WHAT SHOULD I SUBMIT?

    Start with the information that best represents the current version of the design. Avoid including obsolete files unless they provide useful background, and clearly identify any older documentation that is being submitted for reference only.

    ​

    If you are unsure whether a particular file is useful, include it or describe it in the submission. The initial assessment is used to determine whether the available documentation is sufficient and identify anything additional that may be needed before the DFM Audit begins.

    ​

    You do not need a complete professional engineering package to submit. A well-defined CAD model, a prototype, photographs, sketches, or other supporting information may be enough to begin depending on the project.

    2D ENGINEERING DRAWINGS

    Drawings showing dimensions, tolerances, material callouts, notes, finishes, and other requirements that may not be defined by the CAD model alone.

    PREFERRED FILE TYPES

    .PDF

    .PNG

    .JPEG

    3D CAD MODELS

    Computer Aided Design.PNG

    Digital models showing the geometry of individual parts or complete assemblies. STEP and Parasolid files are preferred when available.

    PREFERRED FILE TYPES

    .IGES

    .X_T

    .STEP

    .STP

    .IGES

    .IGS

    .X_T

    2D ENGINEERING DRAWINGS

    Equal Bilateral.PNG

    Drawings showing dimensions, tolerances, material callouts, notes, finishes, and other requirements not defined by the CAD model alone.

    PREFERRED FILE TYPES

    .IGES

    .X_T

    .PDF

    .PNG

    .JPEG

    ASSEMBLY MODELS/DRAWINGS

    combine.PNG

    Documentation showing how multiple components fit together, interact, move, fasten, or locate relative to one another.

    PREFERRED FILE TYPES

    .IGES

    .X_T

    .STEP

    .IGES

    .X_T

    .PDF

    .PNG

    SKETCHES/CONCEPT DRAWINGS

    Formal or informal drawings used to explain features, mechanisms, intended changes, or design ideas. Hand-drawn sketches are acceptable.

    PREFERRED FILE TYPES

    .IGES

    .X_T

    .PDF

    .PNG

    .JPEG

    PROTOTYPE/PRODUCT PHOTOS

    Images showing the current physical design, assembly condition, installation, failure area, or other real-world information.

    PREFERRED FILE TYPES

    .IGES

    .X_T

    .PPTX

    .PNG

    .JPEG

    DESIGN REQUIREMENTS

    Written requirements describing dimensional, functional, performance, material, cosmetic, customer, or other project expectations.

    PREFERRED FILE TYPES

    .IGES

    .X_T

    .MSG

    .PNG

    .JPEG

    .DOCX

    .PDF

    SUPPLIER FEEDBACK

    DFM comments, markups, emails, quotations, or technical questions received from manufacturers or suppliers.

    PREFERRED FILE TYPES

    .IGES

    .X_T

    .PDF

    .PNG

    .MSG

    RFQ/QUOTING DOCUMENTS

    Information previously prepared for supplier quoting that may define expected volume, material, process, tooling, or other production assumptions.

    PREFERRED FILE TYPES

    .IGES

    .X_T

    .MSG

    .PNG

    .JPEG

    .DOCX

    .PDF

    TEST/INSPECTION REPORTS

    Digital Calipers.PNG

    Dimensional reports, prototype testing, failure information, fit checks, inspection data, or other results that provide additional context.

    PREFERRED FILE TYPES

    .IGES

    .X_T

    .MSG

    .PNG

    .JPEG

    .DOCX

    .PDF

    REFERENCE DOCUMENTATION

    Documents Logo_edited.jpg

    Any additional information that helps explain the design, its history, known problems, or previous decisions that should be considered during the review.

    PREFERRED FILE TYPES

    .IGES

    .X_T

    .MSG

    .PNG

    .JPEG

    .DOCX

    .PDF

  • Project submission is the starting point for the Tier-1 DFM Audit process. You will complete the DFM Audit submission form, provide the project information outlined in the previous steps, and upload the most relevant design documentation currently available.

    ​

    Submission does not begin the paid DFM Audit. It gives Tier-1 Engineer the information needed to understand the project, confirm that it is a good fit for the service, and determine the amount of engineering effort expected to complete the review properly.

    BEGIN YOUR DFM AUDIT

    DURING INITIAL ASSESSMENT, TIER-1 ENGINEER WILL:

    Confirm that the project falls within the DFM AUDIT scope

    Review the submitted project information and documentation

    EVALUATE THE MANUFACTURING DIRECTION AND PROJECT COMPLEXITY

    Identify missing or unclear information that may be needed

    Determine the appropriate Review Level

    PREPARE THE INITIAL AUDIT ASSESSMENT REPORT (IAAR)

    WHAT HAPPENS NEXT?

    If the project is accepted, you will receive the IAAR documenting the initial assessment, assigned Review Level, audit scope, price, estimated lead time, and any additional information required before the technical audit begins.

    ​

    You can review the IAAR before deciding whether to proceed. No paid DFM Audit work begins until the IAAR is approved and payment is received.

    ​

    If the project is not yet ready for a DFM Audit, additional information may be requested or a more appropriate Tier-1 Design Readiness service may be recommended.

T1E BACKGROUND.png

CORE OBJECTIVES

Confirm process fit
Review tolerance strategy
Evaluate manufacturability
Evaluate tooling complexity
Identify defect risk
Prioritize DFM actions
mobile DFM - tooling complexity.PNG
mobile DFM - prioritize action.PNG
mobile DFM - manufacturability.PNG
mobile DFM - tolerance.PNG
mobile DFM - defect risk.PNG
mobile DFM - process fit.PNG
T1E BACKGROUND.png

SUBMISSION AND AUDIT BOUNDARIES

Tier-1 DFM Audits are focused on the manufacturability and production-readiness of defined physical product designs. Projects should have enough established geometry, functional requirements, and manufacturing direction to support meaningful process-specific evaluation.

​

Every submission is screened before paid audit work begins to confirm project fit, documentation readiness, intended process and material assumptions, and the scope of manufacturing analysis required.

​

Projects that are incomplete, unusually complex, highly regulated, or missing critical production information may require clarification before proceeding. Work that falls outside the intended purpose of a DFM Audit may be declined or directed to a more appropriate review path.

ACCEPTABLE PROJECTS

MOLDED COMPONENTS

CAST COMPONENTS

MACHINED PARTS

STAMPED / FORMED PARTS

EXTRUDED COMPONENTS

FORGED COMPONENTS

AM COMPONENTS

MECHANICAL ASSEMBLIES

PRODUCT ENCLOSURES

STRUCTURAL COMPONENTS

PROTOTYPES

EXISTING PARTS

MECHANICAL ASSEMBLIES

RFQ-READY PACKAGES

SUPPLIER-READY PACKAGES

*LIST NOT EXHAUSTIVE

MAY REQUIRE CLARIFICATION

INCOMPLETE CAD

MISSING DRAWINGS

UNKNOWN VOLUME

UNCLEAR FUNCTION

UNKNOWN MATERIAL

UNKNOWN PROCESS

TIGHT TOLERANCING

SAFETY-CRITICAL ITEMS

REGULATED PRODUCTS

LARGE ASSEMBLIES

MULTIPLE PRODUCT VARIANTS

LOW-DETAIL PROJECT INFO

*LIST NOT EXHAUSTIVE

OUTSIDE OF REVIEW SCOPE

ELECTRICAL DESIGN

PCB DESIGN

CIRCUIT DESIGN

WIRING SCHEMATICS

FIRMWARE / SOFTWARE

APP DEVELOPMENT

EMBEDDED SYSTEM DESIGN

RF / ANTENNA DESIGN

BATTERY MANAGEMENT DESIGN

SAFETY CERTIFICATIONS

LEGAL DETERMINATIONS

STRUCTURAL PE CERTS

ARCHITECTURAL REVIEW

MEDICAL DEVICE APPROVAL

FIREARM SAFETY APPROVAL

LIVE-FIRE TEST VALIDATION

PROTOTYPE FABRICATION

FULL NPI CYCLES

SUPPLIER MANAGEMENT

PRODUCTION GUARANTEES

*LIST NOT EXHAUSTIVE

T1E BACKGROUND.png

CONFIDENTIALITY AND FAQ

INFORMATION SECURITY

A meaningful DFM Audit requires an open look at the design, and that often means sharing information that is not public and should not become public. CAD models, engineering drawings, prototype images, specifications, assembly details, design concepts, and supporting documentation may represent months or years of development and significant investment.

 

That information is treated accordingly. Materials submitted to Tier-1 Engineer are used for the purpose of understanding your project, establishing the review scope, and performing the engineering work you requested. Ownership of your design and intellectual property remains with you.

 

Project information is not published, shared, repurposed for marketing, or used as portfolio material without your permission. When additional confidentiality requirements exist, NDA requests can also be furnished before sensitive project information is submitted.

 

The objective is to create an environment where you can provide the technical information necessary for a thorough, useful review without having to wonder how your design, documentation, or project details will be handled afterward.

IP SECURITY OVERVIEW

Ownership of your design stays with you

Files are used only for the requested project

Project information is treated as confidential

Nothing is published without your permission

Access is limited to what the review requires

NDA requests can be addressed before submission

CONFIDENTIALITY IS BUILT INTO EVERY REVIEW

TIER-1 DESIGN READINESS SYSTEM TERMS AND CONDITIONS

FREQUENTLY ASKED QUESTIONS

  • Yes. You do not need an engineering degree, job title, or specific professional background to request a DFM Audit. Clients may include engineers, inventors, designers, startups, makers, and small businesses. What matters is having a sufficiently defined physical design and enough information to perform a meaningful manufacturing-focused review.

  • No. Project submission and the initial assessment occur before paid audit work begins. If the project is accepted, the IAAR establishes the Review Level, audit scope, price, estimated lead time, and any additional information required before you decide whether to proceed.

  • No. The Review Level is assigned by Tier-1 Engineer based on the expected engineering effort required to properly complete the audit. Factors may include part complexity, process sensitivity, tolerance requirements, tooling conditions, documentation depth, defect risk, and overall audit complexity.

  • Provide the most current information available for the design. Useful materials may include 3D CAD, engineering drawings, material information, intended manufacturing process, production volume, specifications, critical requirements, supplier feedback, prototype information, RFQ documentation, and any known manufacturing concerns.

  • The audit evaluates the design revision and documentation included within the approved audit scope. The MAAR may recommend design changes, but review of revised CAD, updated drawings, or additional design iterations is not automatically included unless specifically identified within the approved scope.

  • Not as part of the standard DFM Audit. The audit identifies manufacturing concerns, explains the conditions behind them, and recommends corrective actions. Detailed CAD redesign, drawing revision, or ongoing design-engineering work would require a separately defined scope.

  • NDA requests can be considered before sensitive project information is submitted. Any proposed NDA must be reviewed and accepted before it applies to the engagement. Tier-1 Engineer does not automatically accept third-party NDA terms without review.

  • Possibly. The design does not necessarily need to be fully released, but it must be developed far enough to support meaningful manufacturing analysis. If critical geometry, requirements, material, or process direction remain too undefined, additional information or a Design Review may be recommended before beginning a DFM Audit.

  • Yes. A DFM Audit can be useful when transitioning a prototype toward production, evaluating an existing product for manufacturing improvement, or investigating design conditions that may be contributing to recurring tooling, quality, cost, or production problems.

  • A DFM Audit is most useful when an intended manufacturing process has been identified because many DFM requirements are process-specific. If the process is still completely undecided, Tier-1 Engineer may request clarification or recommend a manufacturing process based upon the characteristics of the design.

  • You will be informed during the initial assessment before paid audit work begins. Depending on the project, additional information may be requested, another Tier-1 Design Readiness service may be recommended, or the submission may be declined.

  • The estimated audit window is established in the IAAR before payment. Timing depends on the assigned Review Level, manufacturing complexity, documentation completeness, current workload, and how quickly any required missing information is provided.

  • Yes. Reasonable clarification of the delivered findings is part of project closeout. New engineering analysis, revised-design review, additional documentation, supplier-response analysis, or expanded manufacturing questions may require additional scope.

  • A Concept Review evaluates whether the product idea and development direction make sense. A Design Review evaluates whether the defined design itself makes sense, including geometry, fit, function, interfaces, and assembly. A DFM Audit evaluates how well that design aligns with the intended manufacturing process and identifies manufacturing, tooling, tolerance, defect, and production risks.

    ​

    Put simply: Concept Review evaluates the idea. Design Review evaluates the design. DFM Audit evaluates the design against manufacturing reality.

  • A DFM Audit may still be possible if sufficient CAD and supporting information are available. However, drawings often contain tolerances, material requirements, finishes, critical dimensions, and other information that directly affects manufacturing analysis. If drawings are needed for a complete audit, that will be identified during the initial assessment.

  • The Review Level is assigned before payment using the submitted project information. If substantially new information, revised designs, added requirements, or previously unavailable conditions materially change the expected audit effort, Tier-1 Engineer may pause and reassess the scope before performing additional work. Expanded work is not intended to become an unexpected charge after the fact.

  • Not necessarily. The audit evaluates the design against practical manufacturing principles and the information available at the time of review. Actual supplier capability depends on equipment, tooling, process controls, materials, quality systems, experience, and other supplier-specific conditions. The MAAR can help identify questions and risks to address with a supplier, but it does not replace supplier validation.

T1E BACKGROUND.png

WHY TIER-1 ENGINEER

A useful DFM audit takes more than knowing a list of manufacturing rules. It takes experience understanding how geometry, tolerances, materials, tooling, process capability, suppliers, and production requirements interact once a design leaves CAD and enters the manufacturing environment.

​

Tier-1 Engineer is built on extensive practical design and manufacturing experience developed across demanding automotive and defense environments, with broad exposure to manufacturing processes, materials, tooling, suppliers, production systems, and real-world product development challenges. That background brings manufacturing context into the audit instead of evaluating each feature as an isolated design rule.

​

A strong DFM audit should explain more than what should change. Tier-1 Engineer places equal value on explaining the manufacturing condition behind the finding, the risk it creates, and why the recommended action matters. The result is not simply a list of corrections, but a clearer understanding of how the design interacts with the intended process and what should be addressed before moving forward.

WHAT THAT MEANS FOR YOUR DFM AUDIT

DESIGN FEATURES ARE EVALUATED FROM REAL-WORLD MANUFACTURING CONTEXT

PRACTICAL ENGINEERING JUDGMENT IS APPLIED BEYOND SIMPLE DFM RULES

BROAD MANUFACTURING EXPERIENCE IS APPLIED TO EACH SUBMITTED DESIGN

TOOLING, PROCESS, TOLERANCE, AND DEFECT RISKS ARE CONSIDERED TOGETHER

FINDINGS ARE PRIORITIZED BY REAL PRODUCTION IMPACT

RECOMMENDATIONS INCLUDE THE REASONING BEHIND THE CORRECTIVE ACTION

NO UNNECESSARY COMPLEXITY OR GENERIC CHECKLIST-ONLY ANALYSIS

T1E BACKGROUND.png

START YOUR DFM AUDIT

HOW TO GET STARTED

1. Prepare your project information

GATHER WHAT IS KNOWN ABOUT THE INTENDED PROCESS, MATERIAL, PRODUCTION VOLUME, REQUIREMENTS, AND CURRENT MANUFACTURING CONCERNS.

2. Complete the Project Submission Form

PROVIDE THE PROJECT DETAILS, PRODUCTION ASSUMPTIONS, KNOWN RISKS, AND WHAT YOU WANT THE DFM AUDIT TO HELP EVALUATE.

3. UPLOAD YOUR DESIGN DOCUMENTATION

SUBMIT THE CAD, DRAWINGS, SPECIFICATIONS, SUPPLIER FEEDBACK, PHOTOS, OR OTHER FILES THAT BEST REPRESENT THE CURRENT DESIGN.

4. Tier-1 Engineer performs initial assessment

THE SUBMISSION IS REVIEWED FOR AUDIT FIT, DOCUMENTATION READINESS, MANUFACTURING COMPLEXITY, AND EXPECTED ENGINEERING EFFORT.

5. Receive your IAAR

THE INITIAL AUDIT ASSESSMENT REPORT ESTABLISHES THE REVIEW LEVEL, AUDIT SCOPE, PRICE, ESTIMATED LEAD TIME, MISSING INFORMATION, AND NEXT STEPS.

6. Decide whether to proceed

REVIEW THE IAAR AND AUTHORIZE THE DFM AUDIT ONLY IF THE PROPOSED SCOPE, COST, AND TERMS MAKE SENSE FOR YOUR PROJECT.

A DFM Audit begins with a structured project submission. You provide the current design and manufacturing information, Tier-1 Engineer evaluates the expected audit effort, and you receive a Review Level, price, and lead time before the paid audit begins.

GO TO PROJECT SUBMISSION FORM

No payment is required to submit.

Paid technical review begins only after the IAAR is approved and payment is received.